Fighting day and night, strictly wait!"Flood" fast operation of Licheng Street, Zengcheng District, Guangzhou to build a "safe embankment"

Author:Zengcheng District Rong Media Time:2022.06.19

Facing the continuous heavy rainfall since June 13, in the past few days, Licheng Street, Zengcheng District, Guangzhou moved, and moved in time to take various effective measures to conduct all -round deployment. The people's lives and property are safe.

Quickly start the response

In the early morning of June 14th, Licheng Street launched the four emergency responses of ritual rain and rain in the entire street. At 19:00 on the 14th, Licheng Street launched the emergency response of Zengjiang River Flood Prevention Level 4 and issued three defense notices, requiring various departments to request various departments The village (community) further do a good job of heavy rainfall defense, resolutely, resolutely, and decisively transferred 4 people in the dangerous points along the Zengjiang coast to a total of 4 people, which effectively eliminated hidden safety hazards.

Strengthen the duty on duty

Starting from the flood season, Licheng Street has strictly implemented the 24 -hour duty and leadership and leadership system. One duty leader, one duty team leader and three duty personnel, other village leaders, departments sinking village (community), community (community), Guide flood prevention work and implement the full coverage of hidden dangers.

At the same time, the person in charge of the entire street reservoir and the flood prevention of the entire street and the flood prevention of the entire street, conduct telephone inspections or on -site assault inspections, reminding the responsible persons to perform their duties efficiently and compact the responsibilities of the post.

Highlight the focus of defense

In response to this round of heavy rainfall, Licheng Street dispatched reservoir, pumping stations, and sluice in advance to reduce the water level of the reservoir, reserved the capacity of the reservoir to the arrival of heavy rain, and ensure the safety of the dam.

The main leaders of the street conducted scientific dispatching of the Mutan Reservoir, etc., and flooded in advance to ensure the safety of residents downstream and the Zengjiang River in the reservoir during heavy rainfall, and closely monitor the operation of the water conservancy projects in the street.

Time early warning forecast

According to the flood conditions prediction and early warning information released by the meteorological, hydrological departments, the guide to disaster prevention and avoidance is issued through the WeChat group and public account to improve the ability of the masses to rescue and self -rescue and ensure the safety of the flood.

Life is supreme! Licheng Street will continue to support the "safety umbrella" during the flood season for the people, build a "safe embankment" during the flood season.

Source: Long Yonghui, a reporter from District Rong Media Center

- END -

Is it a crime to help the drug trafficking?| Beijing Fa Tour Lecture Hall (48)

How can adolescents resist drugs?How to distinguish upper electronic cigarettes?Wh...

The Meteorological Observatory of Altay issued high -temperature yellow warning [Class III/heavier]

The Altay Meteorological Observatory issued a high -temperature yellow warning signal at 11:17 on June 10, 2022: It is expected that most of the plains in our district will have high temperature weath