The main structure of the main station of the Chengkun Railway Reunion Line is capped
Author:Chengdu Daily Jinguan Time:2022.08.26
On August 26, the reporter learned from the Chengkun Railway Corporation that the Chengdu -Kun Railway Energy Expansion Reconstruction Project (referred to as: Chengkun Railway Reunion Line), which was built by the Eighth Bureau of the China Railway, was capped at a 24 -meter -high side building at Henan Station. It is also the last main structure of the line. At this point, the main structure of the completion of the completion of the completion of the completion of the Chengkun Railway Reuntelle Line marks a phased victory in the project construction and lays a solid foundation for the follow -up traffic.
The Chengkun Railway expansion transformation project undertaken by China Railway Eighth Bureau Jinkou Henan Station Henan Station 24 -meter -high side station building was successfully capped
It is understood that Jinshan Henan Station is located in Xiangshi Village, Jinkouhe District, Leshan City, Sichuan Province. The building area is about 2971 square meters. Standing buildings. This building standing in the countryside is small. However, although the project is small, the construction is not easy. The station building is built in the mountains and neighbor with the water. The front is adjacent to the river, the back is against the mountain, and the vertical riding is on the existing local and rural roads. The "hanging foot" is self -evident.
Jintou Henan Station has a building area of about 2971 square meters, the number of buildings is three floors above ground, and the building height is about 24 meters
"Jintou Henan Station is the only station building built on the existing rural roads on the complex line of Chengkun Railway, and it is also one of the most important and difficult projects to open the entire line." The construction methods for construction are extremely rare. To be honest, the implementation of this station project, each of us is somewhat a little bit embarrassed. " In the words, they can deeply feel the pressure on their shoulders.
Jingsou Henan Station The whole picture of bird's eye view
Knowing difficulties and not being afraid is the excellent traditional style of the Eighth Railway's builders. The project department first sorted out two major key problems: the construction venue was small, the height difference was large, the high -altitude was wide, and the safety pressure was greatly increased during construction. Essence In order to properly solve these problems, the project department held several technical seminars to take the complex geological conditions on the scene, and adopted a number of new construction processes such as "water milling diamond+weak blasting" and "concrete adding early strong agent". At the same time, they added door holes at the bottom of the structure. During construction, they were set up on the sidelines on the elevated bridge surface ribbon branches. The problem is also solved.
Time is efficiency. The entire construction process, China Railway Eighth Bureau Emi Energy Expansion Project Department's inverted scheduling progress node, in the process to increase the inspection of party members' package inspection, strengthen the management and control of construction process, strengthen personnel management, improve the management system, start construction from starting construction, starting from construction, starting from construction. It took only 140 days to the ceiling. Next, the remaining projects of the construction of the station will also accelerate the promotion, adding an "acceleration" for the early penetration of the Chengkun Fu Line to connect the important channel of the South Asian and Southeast Asian International Trade Port -Cheng Kunfu Line.
Chengdu Daily Jinguan News reporter Hu Datian Editor He Qixie Intern Editor Lu Yarui
- END -
Fanxing | A bowl of fragrance
Figure | Visual ChinaLife is a ray of messy, but you must be able to pull clearly,...
Acceleration, fast lane, new weather!The front page of "People's Daily" pays attention to Yunnan's improvement style and improvement efficiency.
July 25Report on the front page of People's DailyYou chase me and rush to the indu...