From today, these roads are paying attention to bypassing these roads
Author:Changjiang Daily Time:2022.08.26
From Friday (August 26), Guiyuan Temple Road (Hanyang Avenue to Guiyuan Temple North Road), Hanyang District, Hanyang District, Wuhan City, Ping'an Road (Ruian Street to Pingshun Road) and Xinzhou District Xindao Highway will be carried out in engineering construction The vehicles of related road sections cannot be passed. Wuhan Traffic Police issued a detour suggestion to remind drivers to pay attention in time and plan the travel line in advance.
Construction of Guiyuan Temple Road, Hanyang District
From August 26, 2022 (Friday) to December 26, 2023, the underground space project of Zhongjia Village area will be carried out in Guiyuan Temple Road, Hanyang District. Due to the narrow roads, in order to ensure the safety of the traffic, the motor vehicle is prohibited from the transportation of Guiyuan Temple Road (Hanyang Avenue to Guiyuan Temple North Road) during construction, allowing pedestrians and non -motorized vehicles to pass in both directions.
Suggestions of bypassing: The transit vehicle on the construction section of the Guiyuan Temple Road Road to the north to the direction of Hanyang Avenue can be bypass through surrounding roads such as Guiyuan Temple South Road, Guiyuan Temple North Road, Xiaojiawan Road, Jiangjiang Road, Parrot Avenue.
Ping An Road, Wuchang District
From August 27th, 2022 (Saturday) to January 27, 2024, Ping An Road, Wuchang District will carry out the construction of the Central Garden Station of Rail Transit Line 12. During the construction period, motor vehicles (Ruian Street to Pingshun Road) were prohibited from passing.
Suggestions:
1. Entering the vehicle of Nanhu area
Vehicles entering the Nanhu area of Ping An Road can bypass Pingshun Road, Heng'an Road, or bypass T -Qiaonan South Road and Lingnan Road through Xiongchu Avenue.
2. Out of the vehicle in Nanhu area
The motor vehicle that was originally passed on the Nanhu area of Ping'an Road can bypass Heng'an Road, Pingshun Road, or bypassing T -Qiaonan South Road and Lingnan Road through Ruian Street, Ya'an Street.
Xinzhou District Xindao Highway Construction
From August 27th, 2022 (Saturday) to February 27, 2023, Xindao Highway, Xinzhou District, will carry out road improvement project construction. During the construction period, the Xindao Highway (G106 to Dayu high -speed) is forbidden to pass the truck.
Suggestions:
1. The transit truck that was originally from the Macheng direction via the Xintao Highway construction area
1. You can bypass the Daguang Expressway, Shanghai Martial Arts Expressway, or bypass the Ma'an Expressway, Shanghai -Rong Expressway to Huangpi, Yangluo and Wuhan Central City.
2. It can be detoured through G106 to Tancheng City; go to Huangpi City through G106 and G318; detour to Yanggang City through G106, G318, G230; Go to Tancheng District or Wangji Toll Station.
Second, the vehicles from Tuanfeng County via Daguang Expressway and Xindao Highway construction areas can directly bypass G106 to Tancheng.
(Source: Hubei Release, Voice of Hubei)
【Edit: Wang Rongfei】
For more exciting content, please download the "Da Wuhan" client in the major application markets.
- END -
Sudden mudslides have caused 7 people to be killed
The reporter learned from the relevant departments of Guangxi Beiliu City on the ...
Capital | 14 days countdown!
Poster design He YuyangyinEdit Tong WenwenZhang Lingjie Li Yuan, Editor in this is...