Xi'an New Town Flood Control in Xi'an New City in heavy rain acting
Author:Sunshine News • Sunshine.com Time:2022.08.26
Sunshine (Reporter Deng Longhui) Recently, Xi'an continued to rain, and some areas suffered heavy rain, and the temperature also decreased a lot. At night, thousands of lights, silent, while people entered the dreamland, there were still a group of people who insisted on their posts silently and guarded a peace of peace.
At 2:04 am on August 26th, Hao Hengqiang, who had just checked from the flood prevention point, just arrived at the Flood Control Command Center in Hansenzhai Street in Xincheng District, and the ringtone of the phone call sounded again. It turned out to be the water and power outage of the Xinke community, involving 4 communities and 555 residents. Although in the middle of the night, most residents are resting, but he still dare not care about it. In order to ensure that the community's 5 o'clock nucleic acid testing was successfully carried out, and for the safety of the people in the morning, he immediately reported to the leaders on duty and started the situation and started to start the situation and started to start the situation. Emergency plan.
Soon, the maintenance personnel of the power supply company arrived, and the emergency electric vehicle and water supply vehicle also arrived at the scene. An unknown risk protection was quietly carried out in the rainy night. The rain is getting bigger and bigger at night, but the repair operation is still intensely and orderly. After more than 3 hours of repair, it finally recovered water supply and power supply before the residents travel. Many people don't even know the power outage in the middle of night. At this time, Hao Hengqiang joined the work of the whole nucleic acid detection. This is just a small one for the emergency work of the new city.
On August 25, in the investigation of the hidden dangers of the Hujiamiao Temple, the facade of the Liuhe kiln was tilted outside the wall of Liuhe Kiln, and there was a risk of collapse. To this end, the streets immediately submitted the situation to the District Flood Control Emergency Command Center, and jointly warned and reinforced the scene with relevant departments. Due to the recent rainstorm, the walls are not easy to repair. In order to prevent autumn floods from causing secondary disasters, the district flood prevention emergency command center was scheduled on -site, and the dangerous wall was immediately decided. The streets moved. With the roar of the engineering vehicle engine, the critical wall instantly turned into brick gravel, and the "heart wall" that the masses were always worried about were also eliminated.
"Every party member is a banner, and every cadre is a nail." It is this "banner" and this "nail" under the leadership of party organizations at all levels of the city and district. , Rooted in the front line and paid silently, in exchange for the peace and peace of this party.
- END -
"Four Characters" in the city: West Street, Bincheng District depicts a new picture of civilization
This year, the West Street of Bincheng District has adhered to the leadership of t...
The fourth round of "Guangdong Fine Art Teachers' Works Exhibition -Picking Xiang and Cui" will be exhibited in Guangzhou
Hosted by the Guangdong Provincial Artists Association and the Tianhe District Lit...