The G6 Beijing -Tibet High Speed Pakistani Destroyer Destruction Section is restored to traffic
Author:Inner Mongolia New Media Assoc Time:2022.08.25
On August 21, 2022, there was a heavy rainy weather in Wuhai City, which led to severe water destroyed by the Basin Highway Branch of the Inner Mongolia Expressway Group. Mi, road traffic is blocked. After discovering the disaster, the Wuhai Branch of the Inner Mongolia High Speed Group attached great importance to and reported immediately. The emergency response mechanism was launched as soon as possible, and the fifth branch of the company's fifth branch organized the arrangement of machinery and equipment and rescue materials to carry out the road to destroy the road. Relevant departments such as road administration shall implement temporary traffic control on water destruction sections. At the same time, guided the public to travel reasonably through television stations, radio, newspapers, and new media. The rescue work was adopted by the People's Daily, Sohu News, Tencent News, Inner Mongolia Radio and Television News Comprehensive Channel "News Daily", Wuhai City TV Station and other media adopted release.
According to the unified deployment of the Inner Mongolia high -speed group, relevant departments rushed to the scene in time to check the water destroyed roads on the spot, and guided the dispatch of road repair and disposal, operating business management department, maintenance company, Wuhai branch, fifth branch company, maintenance company, maintenance The technical personnel of the company and Inner Mongolia traffic design research and research Co., Ltd. carefully studied the disposal measures and construction plans. On the premise of ensuring the safety of the construction site, the repair work was carried out day and night. 10320 square meters, 6000 cubic gravel, and more than 100 tons of cement. With the coordination of the force of various departments, after continuous fighting day and night, the water destroyed bridge snatched through and had safe traffic conditions at 18:00 on August 24. At present, all vehicles in the Pakistani section of the G6 Beijing -Tibet High Speed high -speed speed can pass normally.
In the next step, Wuhai Branch will strictly implement the 24 -hour duty system in the flood season, pay close attention to the weather conditions, strengthen the inspection and hidden danger investigation of road sections, do a good job of emergency response work, and make every effort to ensure public travel safety.
Source: Inner Mongolia Expressway Group Co., Ltd.
- END -
Wuping people's and social bureau: Inject Huimin and Huiyu Enterprise Combination into the development of "strong heart agents"
Do you understand the policy and application process of the stabilization job? Can...
There are a few truths!The State Administration of Taxation has explained in detail which industries and enterprises to benefit from which industries and enterprises
China Economic Net, Beijing, July 22. Cai Zili, director of the General Auditer and Income Planning Department of the State Administration of Taxation, said today that the implementation of large -sca