The research report on the S5 line of Chengdu to Meishan Railway will be approved to be fully entered the construction stage
Author:Cover news Time:2022.08.24
Cover reporter Yang Ruiwen
On August 24th, the cover reporter learned from the Chengdu Rail Transit Group that on August 23, the project feasibility study report of the Chengdu to Meishan Line (S5 line) of the Municipal (suburban) railway was approved by the Sichuan Provincial Development and Reform Commission, marking the completion of it. The eyebrow line project will enter the stage of construction.
According to the plan, the main line of Chengmei Line is connected to the direct management area of Tianfu New District and Meishan City of Chengdu City, and connects the Chengdu Science City area, Tianfu Cultural Innovation City, Meishan City View Gao District, Ledigan Paradise, Heilongtan Tianfu Ecology Area, and West of Qidong New District West From the area to Meishan City, it starts from Honglian Station to transfer with Rail Transit Line 16 and Line 19, and stops at Meishan East Station.
The line mainly follows Jiazhou Road-Yizhou Avenue-Tianfu Avenue Meishan Section-Wenzhong Street, which is walking northeast to southwest. The city (suburban) railway Chengdu to Meishan Line engineering line is about 59 kilometers in length, of which about 19 kilometers in length and about 40 kilometers in the range of Meishan; the design speed is 160km/h; Station, Xinglonghu West Station, Jiancha Station, Cultural and Cultural Creative City Station, Xuangao Station, Nanyutu Park Station, Ledigan Station, Heilongtan Station, Yidong New District Station, Meishan North Station, Music Plaza Station, Meishan Shandong Station, Among them, there are 8 elevated stations and 5 underground stations. There are 1 vehicle base of Gaowan Village; 1 Meishan North Parking Lot, 2 main substations, and 1 control center.
The Chengdu -Meishan Line Project of the Municipal (Suburban) Railway is an important traffic infrastructure that connects into the metropolitan area network. It is the main channel of Meishan and Chengdu. After completion, it will effectively shorten the time and space distance from Chengdu to Meishan, promote the efficient gathering of industries, population and various production factors between the two places, and strengthen the role of Chengdu's central city. The construction of the Shuangcheng Economic Circle and the development of Chengde Emerald and the development of urbanization are of great significance.
The relevant person in charge of Chengdu Rail Group said that in the next step, Chengdu Rail Group will make every effort to promote the follow -up work of the city (suburban) railway Chengdu to Meishan Line project to strive to achieve the construction of the project as soon as possible. Provide strong guarantees and contribute to the construction of a beautiful and livable park city demonstration area.
- END -
After 41 years of disappointment, my sister and brother cried for a headache, and met my mother together.
Jimu Journalist Zhang WanjunOn the afternoon of July 1, in a hotel in Nanping, Fuj...
The basic pension of retirees in Hubei Province in 2022 is determined to be raised
Hubei Daily Client News (All Media Trainee Guo Weitong) On July 13, the reporter learned from the Xiangyang Human Resources and Social Affairs Bureau that the basic pensions of the retirees of Xiangya