Multiple sections of Qinghai are affected by rainfall and secondary disasters affected road interruptions to implement traffic control
Author:CCTV News Client Time:2022.08.22
On August 22, Qinghai Province was affected by continuous rainfall weather and caused road interruptions. Multiple road sections implemented traffic control and semi -pass.
On August 22, the traffic control section affected by weather:
1.G0611 Zhangwen Highway, the Tongxian Road, the entrance of the No. 2 Tunnel of the Longwuxia, the section of the Waka Beach (to the direction of the Tyrania to the Tongren). The Muzhuan Tunnel 4 (Tosheh to Tongren) is on the road, and the road cannot pass. Longwuxia No. 5 Tunnel (two -way) mudslides on the road, the road cannot pass. Transportation control (two -way) traffic control (two -way) traffic control.
2. G0611 Zhangwen high -speed teeth are caused by the mudslides due to strong rainfall. The traffic control of Tongren North Ring Toll Station and Tongren North Main Line Toll Station will be prohibited.
3.G310 connects the co -line, (Qu Buzang Village) section of the road section is severe, which leads to interruption of highway traffic.
4. G213 strategy line, (Wajan to Longwuxiakou) section of the road occurs due to heavy rainfall road sections, resulting in interruption of highway traffic.
5. G213 strategy line, (Tongzha Yellow River Bridge Bridge Head) section of the section of the section of the road is sudden, the traffic is interrupted.
6.S206 Pinglong Line, floods occurred in the section of the (Xixigou), which led to the right side of the road, and there were hidden safety hazards. The traffic police department implements traffic control on the section.
7.S206 Pinglong Line, (Tibetan Tibetan Township, Street to Gangcha Mountain) section of the road due to the sudden rainstorm flow, which leads to interruption of highway traffic.
8.S206 Pinglong Line, (Langjia, Gangchashan to Tongren security guards) occurred in many sections of muds and stones, causing road traffic interruption.
9.S318 new line, (Bridge 6 Bridge in Narad), water destroys, the road cannot pass normally.
August 22 is affected by the weather half -passing section:
1.G0611 Zhangwen Highway, the same road section of the same road is on the road of mudslides (colleagues to Ya Shi), occupying emergency lanes and driving lanes, and the overtaking lanes are normal.
2.S104 Xigui Line, the K30 highway K30 (湟 湟 to Guide) is on the road. The driving lanes and emergency lanes are being cleaned, and the overtaking lanes are normal.
3.S104 Xigui Line, (Xining to Guide's direction) The right high -side slope has drop stones, the driving lane is closed, and the overtaking lane is through.
4.g227 Zhangmeng Line, (Dorwa Village, 30 kilometers away from Guide County) sections due to strong rainfall, causing half of the road.
5. G227 Zhang Meng Line, the (hot water ditch) section due to rainfall, resulting in half of the road.
6.S206 Pinglong Line, (Huatong County Hospital of Traditional Chinese Medicine), due to the hidden safety hazards on the right side of the rainfall road, half of the road is connected.
7.S306 Guanha Line, (2 kilometers away from Benjun Village), was affected by heavy rainfall and the mudslides occurred, and the road was half through.
8.S306 Guanha Line, (Qunjia) section of the road due to strong rainfall, resulting in half a passing road.
(Mao Baowu Liu Chuqi)
- END -
Green casting empowerment high -end manufacturing
Express Yunxun today, the three -day 2022 eighth Shandong (Weifang) Equipment Manu...
Yinchuan City: Strengthen the use of "seven measures" to promote the implementation of the main responsibility of food companies
Source: 2022-07-07 13: 44 · China Food Safety Newspaper Ningxia StationImplementing the main responsibility of food production and operation enterprises is the most important, critical, and core meas