Flood prevention work in Duolun Power Supply Co., Ltd. has worked hard to ensure the stable operation of the power grid
Author:Linquan Communist Youth League Time:2022.08.18
Recently, continuous heavy rain has caused flood disasters in some areas, and the safe and stable operation of the power grid faces severe tests. In order to ensure the security and stability of the power grid and ensure the smooth transition from the critical period of the construction of the power grid, the flood prevention work of the Duolun power supply company has been planned and effectively cope with it to ensure the peak summer and safe flood. The company promptly adjust the leading group and the flood prevention office in a timely manner, clarify rights and responsibilities, highlight the focus, and implement flood prevention measures layer by layer. Actively establish a linkage mechanism with relevant government departments, cooperate with the local government to do a good job of flood prevention and rescue tasks such as rescue, disaster relief and post -disaster recovery power supply, and start with the personal, power -guaranteed grids, and equipment, and carefully arrange the operation of the power grid.
在加强防汛应急机构、队伍和救援体系的建设中,分公司不断总结经验,把该项工作纳入常态化管理,防汛应急指挥中心和应急队伍进入战备状态,定期检查应急准备情况,动态修编应急Plan, strengthen emergency scheduling and communication management, scientifically dispatch emergency supplies, strengthen the construction of emergency teams, and organize key departments, party member volunteer service teams and power supply places to participate in the county flood control drills, actively carry out professional linkage flood prevention exercises, and continuously improve power grid emergency emergency response Disaster reduction work, the majority of party members regarded floods as orders, and used the front line of flood prevention and disaster relief as the main battlefield of the initial mission, actively litting their identities, picking heavy burdens, and actively supporting and participating in disaster warning and flood prevention. The branch and local flood control department and meteorological department have established early warning information interoperability and emergency linkage mechanisms to understand weather and geological changes, and effectively coordinate and resolve the existing problems as soon as possible. As of August 15th, the branch has compiled 1 emergency plan, established 12 emergency teams, 98 emergency personnel, 1 vehicle mobile vehicle, 1 emergency power vehicle, 1,263 places in the inspection station, infusion and transformation facilities, have already been in the site, and the infusion facilities. Turn to 12 places. (Chi Longge, Ding Luying)
- END -
Ministry of Water Conservancy: As of the end of July, the 567.5 billion yuan investment in water conservancy construction increased by 70 % from the same period last year.
Cover news reporter Teng YanOn August 10, Liu Weiping, deputy minister of the Mini...
Fighting along the road of strong troops with Chinese characteristics
Fighting along the road of strong troops with Chinese characteristicsSeeking magaz...