Subsequent | rupture playground, it must be repaired before school
Author:Straits Herald Da Zhangzhou Time:2022.08.18
The playground of the Zhangzhou Taiwan Business Investment Zone Third Experimental Primary School (hereinafter referred to as the "Sanzhuo") was severely damaged and cracking into countless fragments of different sizes (see the Straits Herald report on August 16).After the report was published, it attracted the attention of relevant departments of the Taiwan business district.
On the afternoon of the 16th, the Herald reporter was informed that the heads of relevant departments and relevant personnel of the owner of the agency of the construction of the owners have been surveyed on the spot and made a repair plan.
According to President Liu Xiaoshi Xiao Liu, after careful investigation by all parties, the ground sinking is one of the factors that cause damage. The most serious area of damage is the surroundings of long jumping bits, and the long runway is still intact.It was decided to shovel the plastic in the area and change to artificial lawn.The damaged places near the basketball court and the area near the flag -raising platform were also repaired.President Liu also said that it will be completed before school, so that parents of the majority of students can rest assured.
祥Anchor reporter Wang Longxiangwen/Picture Editor Hong Tingting
- END -
Zhaoping County Meteorological Orange Orange Early Warning signal [Class II/Severe]
Zhaoping County Meteorological Observatory lifted the orange warning signal at 09:32 on June 08, 2022.
Heilongjiang Suihua Ecological Environment Monitoring Center went to Suihua City (county) to carry out research activities
In order to thoroughly implement the spirit of the construction work conference of...