Seven months!This section is broken

Author:Xingtai.com Time:2022.08.17

The disconnection announcement is based on the document of Jizong Gong [2022] No. 216, and must be constructed to the Dasha River Bridge (uplink) from Beijing to the Hong Kong Highway G107 to the Hong Kong Highway G107.L for).The disconnection time is from August 31, 2022 to March 31, 2023.For past vehicles, personnel should pay attention to the on -site traffic signs and guide signs to ensure traffic safety. Construction brings you inconvenience, please forgive me!

Source: Xingtai Daily

Xingtai.com, praise 19

- END -

High -pressure high -temperature high -temperature high -humidity weather continues

Our province welcomes a high temperature day, 35 ° C is standard, with a local area of ​​40 ° C, and the physical temperature may exceed 50 ° C. What are the causes of this round of high temperat...

The seventh stop Danzhu head community!Stopping on the road of Chuangwen, the literary spring breeze comes

Reading/Shenzhen Business Daily reporter Feng Shu Yang Zhang YimengIn order to act...