Yanji Park Passer -Passenger Field Bridge is planned to be put into use on August 20
Author:Yanji Propaganda Time:2022.08.17
On August 11, the reporter saw at the construction project of Passenger Xingqiao, Passenger Passenger Passenger, Yanji City that the construction staff carried out details of the bridge, and the elevators and escalators on both sides of the construction road had been installed.
It is understood that the bridge of the Passer -by Passer -by Passenger Passenger Passenger Bridge of Yanji City is 48 meters long, the bridge width is 5.2 meters, and the net height under the bridge is 4.9 meters. At present, the steel structure of the main bridge has been completed, and 85%of the total project volume is completed.
Zhang Canxu, a staff member of the Urban Construction Section of the Housing and Urban Construction Bureau of Yanji City: "At present, the construction of the main body of the steel structure, the welding of the shed, the elevator and the installation of the four escalators on both sides, and the shed glass has also been installed."
In the next step, the installation of curved glass will be carried out, and the ground construction of the corridor in the bridge will be put into use on August 20.
(Source: Yanbian Traffic Literary Broadcast)
- END -
How to adjust the psychology after resumption?How to deal with irritability?Look at this tip →
A short period of time under the epidemic situation Anxiety and depre...
From July 3rd, the high vehicle in Changsha has traffic control (detailed detours)
Changsha Evening News, Changsha, July 1st (All Media Reporter Zhang Yangzi Corresp...