@, Xinhu Street (Xinhe Road to Jiefang Avenue section) one -way pass
Author:Texas Daily Time:2022.08.17
On August 16th, the water renovation project of Xinhu Street has begun construction. In order to ensure the safety and orderly traffic of road traffic around the construction area, the municipal public security traffic police department will temporarily control the section of Xinhu Street (Xinhe Road to Jiefang Avenue). Measures, the section of this section is temporarily changed from north to south.
Due to the construction needs of the water supply pipeline project, the construction party from August 15th to October 15th closed the east halfway of Xinhu Street (Xinhe Road to Jiefang Avenue). In order to promote the construction progress, the construction party began construction from the north and south sides. Due to the residential communities, schools, and shops around the construction road section, people have a large traffic during the morning and evening peaks. During the road construction, in order to improve road traffic as much as possible and ensure the safety of the general public, the traffic police department except for the above roads to implement one -way traffic on the above roads. Measures strengthen the control of the surrounding area of the construction area. At the same time, the traffic police department coordinates the staff on duty and guidance on the construction section to ensure that the passenger vehicles can be detoured safely.
The traffic police here remind the general public that travel is planned in advance, and the construction road section cooperates with the on -site staff to direct and guide, and follow the instructions of on -site traffic signs.
Produced by Dezhou Daily New Media
Reporter, Editor | Ma Le Correspondent | Zhang Yalei
- END -
Warm feedback warmth!Courier brother adds "cool" to "M50 Love refrigerator"
At 12:16 on July 25, a young man in black pants wearing black pants took out a box...