Panjiakou Reservoir Reservoir and Surrounding Area Lianqian Defense Lianhelian joint construction long -term mechanism has been fully launched and implemented

Author:Hebei Radio and Television Sta Time:2022.08.16

Recently, the Ministry of Water Conservancy's Maritime Commission Quoting Engineering Administration and the People's Government of Kuancheng Manchu Autonomous County, Chengde City jointly issued the "Implementation Plan for the Construction of Panjiakou Reservoir Library and the Surrounding Regional Londries and Regional Control and Land" Basin regional cooperation mechanism has been fully launched.

The plan clarifies the responsibility of the supervision and problem of water management unit, the responsibility of the local government's territorial management and the rectification of the problem, and in order to form a working pattern of supplementary power, responsibility, pragmatic and efficient, and mutually beneficial and win -win. The environment has been effectively protected for a long time, and the sustainable and healthy development of the regional economy provides institutional guarantees.

image.png

Picture: Panjiakou Reservoir

Establish a "joint defense" system. Establish a joint inspection mechanism, build a reservoir and surrounding county and township -level river -length hierarchical packaging sections to ensure the area of ​​water environmental quality packaging guarantee system in the area management area. The scope of the area (town) in the surrounding area (town). The watershed institutions set up the "Inspection Commissioner" Bao Baoxian County and Township (Town) to cooperate with the county -level river length to conduct no less than one survey and inspection every two months, and the township (town) -level river length conducts no less than two inspections a month Make sure the problems are discovered early and dealt with early.

Establish a technical defense cooperation mechanism, integrate the satellite remote sensing of the watershed institution, and the local government's intelligent video surveillance, drone inspection and other technical means, establish and improve the information sharing mechanism, and improve the ability to dispose of problems all -round and all -round real -time real -time discovery.

Establish a joint issue identification mechanism. Through policy explanations, on -site analysis, case comparison, etc., organize technical experts to give lectures, and conduct special training for relevant personnel at all levels, relevant personnel of the county departments, and "inspection commissioners" such as inspection. Training improves personnel and quality, uniformly identify standards, procedures, and disposal methods, and improve the time limit for inspections and solve problems.

Establish a "Lianzhi" system. Establish a problem handling cooperation mechanism. After the "four chaos" difficulties within the scope of reservoir management identified by the basin institution, they should take the initiative to connect with the local government to formulate rectification plans through joint office clubs to implement rectification responsibilities. The rectification of the problem is coordinated and resolved by the local government. The watershed institutions provide policy, technology, and capital support, and promote the implementation of the work.

Establish a joint regulatory law enforcement mechanism, and implement the joint regulatory law enforcement of the "basin supervision law enforcement agency + county administrative supervision and law enforcement department". Treatment plans, carry out normalized joint inspections and joint law enforcement, and coordinate handling cross -border violations of laws.

Establish a joint meeting and joint office mechanism. The watershed institutions are responsible for comrades and director of the county and river chief office as the general call personnel, organizing joint meetings to coordinate and resolve related matters. The watershed institutions sent the "Supervision Commissioner" to the county river chief office joint office, responsible for the contact work of the specific matters of upstream and downstream of the upstream and downstream. Essence The county and river chief office is responsible for the supervision, guidance, inspection and assessment of the internal gates of the county and the performance of the lower -level river director.

Establish a "joint construction" system. Establish a project construction mechanism, and the local government plans to implement the development and construction of the area around the reservoir. It shall focus on the development and construction of the people's livelihood in the field of people's livelihood with green, cleaning, and safety projects. Implement the federation review mechanism for major construction projects, and select technical experts to participate in the entire process to provide technical support in terms of policies and business to ensure that major development and construction projects serve the society in accordance with laws and regulations.

Establish a watershed governance collaboration mechanism. Based on the actual situation, the basin institutions make timely opinions and suggestions on the management of the basin, reasonably determine the governance area and implementation projects, assist in running for approval procedures, and provide support and help. When the local government plans to implement the basis of the basin governance project, the opinions and suggestions put forward by the basin institutions shall be negotiated to deal with relevant matters on the basis of fully demonstrating to meet the ecological needs of reservoir water and water safety.

Establish a joint investigation mechanism for the basin construction project. The basin institutions and the local government have jointly investigated the major projects of the development and construction of the area around the reservoir to achieve a notification beforehand, the supervision in the event, and the acceptance of the post -afterwards.

Since the implementation of the river and lake length system, the Kuancheng County and the Maritime Commission quoted the bureau relying on the rivers and lakes system to actively carry out joint prevention and joint control, strengthen cooperation between local governments and watershed institutions, and vigorously solved a number of historical problems. Since the beginning of this year, the Kuancheng County and the Maritime Commission Citation Bureau have successively organized two special actions: joint inspections and "water -saving and water -protection" joint law enforcement. The behavior of construction and other behaviors was conducted on the spot, 1 search for illegal fishing boats was seized, 5 sets of anchor fishes were collected, 8 Swallow.com, 2 lampshade nets, and 26 ground cages were removed. content. The plan is formulated and introduced on the basis of in -depth summary and improvement of practical experience. In order to build a working system for efficient, high -quality, and high -level joint defense joint control, further enhance the ability of rivers and lakes in the basin area, and continue to deepen the ecological environment Co -preventing, co -construction and sharing results provide a long -term mechanism guarantee.

- END -

Jin Yong's words were recorded into "Xin Qiji Ci"?Books must respect the facts

Wen | Xing YanyanRecently, some netizens said that they bought a Xin Qiji Ci in th...

Beijing Chaoyang: Strengthen the supervision and inspection of pharmacies

In order to comprehensively implement the requirements of the Beijing epidemic pre...