"Urban Factory" new model!The second phase of Chutian Media Science and Technology Park started
Author:Pole news Time:2022.08.16
Jimu Journalist Hu Changxing
Intern Xiang Ke Yan Wu Yuzheng
On August 16th, the second phase of Chutian Media Science and Technology Park started in Optics Valley. This is a high -standard "industrial upstairs" project that requires approval in accordance with the latest planning requirements in Wuhan Donghu High -tech Zone. The project is undertaken by the 11th Metallurgical Group, and Zhongtao Huasheng Engineering Technology Co., Ltd. is responsible for supervision.
Chutian Media Science and Technology Park is invested by Hubei Daily Media Group, covering an area of 308 acres. It is located at the intersection of the South Third Ring Road and Optics Valley Second Road in the Wuhan Donghu High -tech Zone. The park focuses on the emerging optoelectronics industry, and builds advanced manufacturing industrial parks mainly based on research and development and production of chips, detection, laser. At present, the first phase of the park has settled in 7 scale technology companies, including 2 listed companies and 3 listed companies. Initially, the chip manufacturing, testing, laser research and development and production of chip manufacturing, testing, laser research and development and production, which are mainly based on Wuhan Huari Precision Laser Co., Ltd. and Taisi Technology (Wuhan) Co., Ltd., have an annual total output value of more than 3 billion yuan.
Chu Tian Media Science and Technology Park Real Estate
The second -phase project that is about to start, with a total investment of 139 million yuan and a total construction area of 42,000 square meters. It is designed in accordance with the latest planning of the Optics Valley "Industry upstairs". Among them, the first floor is 6.5 meters high, and the floor above the second floor is 4.5 meters; the pillar spacing is 8.1 meters, and the load is 800kg / ㎡, which can meet the research and development, production, testing and office needs of 1,000-40,000 square meters. High -end manufacturing industry enterprises with the main business settled in.
Chu Tian Media Science and Technology Innovation Park Phase II Bird's Episora Reverages
The relevant person in charge of Chutian Media Science and Technology Park said that "industry upstairs" is different from the production in a single -story plant under the traditional model. The development of "urban industry" is a new exploration of intensive development of industrial land in the park.
Chutian Media Science and Technology Innovation Park second phase renderings
- END -
Wait two months?Hu Ge's new drama "County Party Committee Courtyard" is officially killed
Text/Yangcheng Evening News all -media reporter Gong Weifeng intern Hou YingTwo mo...
Lixulin under a Qinghe
Liulin is good.There are spring, and it is a hot spring.Forty Miles Shaking River ...