The super -police flood and water conservancy department in the Tarim River fully defended the response
Author:Guangming Daily Time:2022.08.14
Our newspaper, Beijing, August 13th. Reporter Chen Chen learned from the Ministry of Water Resources on the 12th that from August 9th to 11th, the western part of Xinjiang Uygur Autonomous Region was small to medium rain, and the maximum rainfall Bayin Guo Leng Autonomous Prefecture Barin Brook 43 mm. Affected by rainfall and high temperature melt, the Tarim River dry flow and its tributaries Yeerqian River, Aksu River, Weigan River and other 21 rivers with over -alarm traffic occurred. Among them The river exceeds guarantee traffic. At 12 o'clock on the 12th, the Tarim River was still super warning from the Alar section of the Tarim River to the Alar section, the Baya to the Usmani River section.
The Ministry of Water Conservancy pays close attention to the rain of water in Xinjiang, rolling the conference merchants, and issuing a notice to the Water Resources Department of the Autonomous Region on the prevention of heavy rainfall prevention work. As of the press release, the Xinjiang Uygur Autonomous Region's Water Resources Department launched a flood defense level IV emergency response, guiding and supervising the relevant places to do a good job of prevention and response of floods, and taking into account the use of flood resources; issuing warning to the responsible persons in the influence zone to remind more than 4,400 SMS messages to SMS , A targeted reminder information to the masses in the dangerous area will target more than 4 million information; scientific dispatch water projects, give full play to the flood control effect of controlling water conservancy projects, the peak cutting rate of the backbone reservoir is 37.5%to 57.1%, which will minimize the upstream flood prevention in the lower reaches. pressure. The cities and states along the Tarim River invested a total of 2,8560 rescue machinery, 70,774 artificial artificially, 950,000 cubic meters of earth and rocks, etc., completed 113 places for maintenance, reinforcement, and escorting insurance. The Xinjiang Production and Construction Corps deployed the defense of water and drought disasters in a critical period of flood prevention. The Water Resources Bureau of the Corps successively sent multiple working groups to the scene to conduct supervision and inspection, and do a good job of various defense work.
- END -
The problem of helping the company relieves the problem of relief really helps to promote the effectiveness
In the past few days, the management committee of Jianyang Linkong Economic Industry Park has collaborated with relevant departments to rely on the Jianyang City Stable Market to Promote High -qualit
Suzhou Rail Transit Line 6 contact network project is installed in the first piece
Suzhou Rail Transit Line 6 contact network project is installed in the first piece...