The total investment is about 1.87 billion yuan!Putian will build two new roads
Author:Straits Herald Putian News Time:2022.08.12
August 10th
Putian Yongjia Street (pot highway ~ Huixiang Avenue) and
Putian City Lake Binnan Road (Chenggang Avenue ~ Tianfei Road)
Road Construction Engineering Proposal
Feasibility research report is approved
Let's take a look at the details
The Licheng District Development and Reform Bureau on the approval of the road construction engineering proposal and feasibility study report of Yongjia Street (pot highway ~ Huihao Avenue) in Putian City
Putian Municipal Construction Engineering Co., Ltd.:
Your Division "Putian Municipal Construction Engineering Co., Ltd. on the application for approval of Putian Yongjia Street (pot highway ~ Huiyao Avenue) road construction project proposal and feasibility research report" and related attachments are received. After research, principles agree to build the project, and the relevant matters are approved as follows:
1. Project name: Putian Yongjia Street (pot highway ~ Huixao Avenue) road construction project (Project code: 2207-350304-05-942525)
2. Construction address: Xindu Town, Licheng District, Huangshi Town
3. Construction scale and main content: 9.3756 hectares of project planning land, new urban main roads, two -way eight lanes, roads from the road, K4+506.095 ~ K5+960, length is about 1.45km, design speed: 60km/h, red line width, red line width 60m. The construction content of this project mainly includes road engineering, bridge projects, water supply drainage projects and affiliated projects.
4. Source of total investment and funds: The total investment of the project is estimated to be 669.41 million yuan, of which the project cost is 298.442 million yuan, the project construction costs are 32,428,800 yuan, the basic reserve costs are 311.441 million yuan, and the interest rate of RMB 15.389 million in construction period. Source of funds: In accordance with the relevant documents of the municipal government.
Fifth, construction period: 24 months.
6. Social stability risk assessment: The project has carried out social stability risk assessment in accordance with relevant regulations, and has been reviewed and approved by the People's Government of Xindu Town and the People's Government of Huangshi Town. The overall risk level of the project is low risk. Please strictly implement project risk prevention and resolution measures, and effectively safeguard the vital interests and social stability of the masses.
7. Engineering bidding: shall be implemented in accordance with the bidding and bidding law and relevant regulations.
8. Energy -saving requirements: You should build energy -saving technologies, processes and equipment in accordance with relevant energy saving standards and standardized construction, strengthen energy -saving management, and continuously improve the energy efficiency level of the project.
9. Others: Please conscientiously implement measures such as safety production, environmental protection, and soil and water conservation in accordance with relevant national regulations. Based on this batch, please hurry up the institutions with the corresponding qualifications to carry out survey and design work, prepare preliminary design of the project, and report the initial design of the project in accordance with regulations. For relevant procedures of other departments, please handle it in accordance with relevant laws and regulations.
Development and Reform Bureau of Licheng District, Putian City
August 10, 2022
The Licheng District Development and Reform Bureau on the approval of the road construction engineering proposal and feasibility research report on the road construction project of Lake Binnan Road (Chenggang Avenue ~ Tianfei Road)
Putian Liyuan Garden Co., Ltd.:
Your Division "Putian Liyuan Garden Co., Ltd. on the application for approval of Putian Hubin South Road (Chenggang Avenue ~ Tianfei Road) Road Construction Engineering Proposal and Feasibility Research Report" and related attachments are received. After research, principles agree to build the project, and the relevant matters are approved as follows:
1. Project name: Putian City Lake Binnan Road (Chenggang Avenue ~ Tianfei Road) Road Construction Project (Project Code: 2207-350304-05-639941)
2. Construction address: Xindu Town, Licheng District
3. Construction scale and main content: 19.9383 hectares of project planning land, new urban main roads, 3108.658m in length, 60m width of the road red line, 30km/h in the design speed main road. The construction content of this project mainly includes the construction of roadbed pavement engineering, bridge culvert engineering, transportation engineering, power engineering and other subsidiary projects.
4. Source of total investment and funds: The total investment of the project is estimated to be 120,3401,300 yuan, of which the project construction fee is 440.539 million yuan, the project construction costs are 705.5574 million yuan, and the reserve costs of the project construction are 57.3049 million yuan. Source of funds: Raiders in accordance with relevant documents of the Municipal Finance Bureau.
Fifth, construction period: 26 months.
6. Social stability risk assessment: The project has carried out social stability risk assessment in accordance with relevant regulations, and has been reviewed and approved by the People's Government of Xindu Town and Zhenhai Street Office. The overall risk level of the project is low risk. Please strictly implement project risk prevention and resolution measures, and effectively safeguard the vital interests and social stability of the masses.
7. Engineering bidding: shall be implemented in accordance with the bidding and bidding law and relevant regulations.
8. Energy -saving requirements: You should build energy -saving technologies, processes and equipment in accordance with relevant energy saving standards and standardized construction, strengthen energy -saving management, and continuously improve the energy efficiency level of the project.
9. Others: Please conscientiously implement measures such as safety production, environmental protection, and soil and water conservation in accordance with relevant national regulations. Based on this batch, please hurry up the institutions with the corresponding qualifications to carry out survey and design work, prepare preliminary design of the project, and report the initial design of the project in accordance with regulations. For relevant procedures of other departments, please handle it in accordance with relevant laws and regulations.
Development and Reform Bureau of Licheng District, Putian City
August 10, 2022
- END -
High temperature+strong convection at the same time!Local heavy rain or rainstorm in Weifang
Charcoal Bake Model continues to openWeifang ushered in high temperature weather t...
Deepen the construction of the ability, the "red and yellow" flag of the flowing "red and yellow" flag of the Luohe Urban Management
Dahe Daily · Yu Video Reporter Liu Guangchao Correspondent Yang Yan Tian Xiaopeng...