State Grid Heilongjiang Electric Power Guarantee World 5G Conference Power Supply Safety and Relief
Author:Power grid headline Time:2022.08.12
On August 10, the 2022 World 5G Conference opened in Harbin City, Heilongjiang Province. State Grid Heilongjiang Electric Power Co., Ltd. successfully completed the opening ceremony of the opening ceremony of the conference.
On August 10, employees of Harbin Power Supply Company inspected the power consumption facilities at the opening venue of the World 5G Conference in 2022. (Photo by Zhang Bozong)
State Grid Heilongjiang Electric Power Ahead of the State Grid, organizes Harbin Power Supply Company to formulate an electrical preservation work plan, accident processing plan, and an emergency plan for power supply. With the principle of "one stop and one case" and "first -line case", the electricity preservation plan for related lines was formulated.
On August 10, employees of Harbin Power Supply Company inspected the power consumption facilities at the opening venue of the World 5G Conference in 2022. (Photo by Zhang Bozong)
Harbin power supply company employees entered the site 15 days in advance for survey, and installed a 200 kV safety power supply and 630 -way automatic conversion switching equipment with a rest day and connected one 400 kilowatt emergency trains as a backup power supply venue power supply safety. Essence Two days before the opening ceremony, the company fully completed the preparation of electricity preparation such as full load testing, emergency accident drill, and important load contact temperature measurement.
The conference planned to be closed on August 12. As of now, the State Grid Heilongjiang Electric Power has invested 193 electricity personnel and 67 electric vehicles.
The World 5G Conference has been successfully held in Beijing and Guangdong. The conference is the fourth session. The theme is "building 5G ecology, promoting the Communist Party to create and gaining benefits". /Theme seminar.
- END -
Mozhu Gongka County Meteorological Bureau Lightning Orange Early Warning [Class II/Major]
Mozhu Gongka County Meteorological Bureau was lifted at 00:00 on June 08, 2022. 00:00 26 seconds to release the thunderbolt orange warning issued at 18:23 on June 07, 2022.
"Steel Ball" turned out to be a secret code in the live broadcast room to cover the tobacco and sell tobacco
Live screen and shopping car interface (Source: Screenshot of a live broadcast roo...