The planning of Guangzhou Haizhu Lili Division is released!Create iconic, futuristic, fireworks digital science and technology bay
Author:Golden sheep net Time:2022.08.12
Planning of the Planning of the Lizhu area
Yangcheng Evening News all -media reporter Sun Qiman Correspondent Sui Zhizhi Xuan
On August 10, the third meeting of the 4th Guangzhou Municipal Planning Commission Regional Planning Professional Committee was held. At the meeting, the "AH1017 -AH1024 Planning Management Unit) Control Detailed Plan" was reviewed and approved.
The planned area is located at the high -quality development band at the southern end of the new city axis and the Pearl River coast. It is an important portal area. The plan passed this time is the optimization and enhancement version of the planned Lizhu area planned in 2019. According to the plan, in the future, the area will form a "continuing urban axis, highlight the image of the portal" , Continue the three consensus of the real place, create a digital science and technology bay with iconic, futuristic, and fireworks.
Survey fixed -line update
Planning optimization adjustment
The reconstruction of Lizun Village has been for many years, and the planning of the Lizhen area has also been approved. In January 2019, the "City Design and Control Detailed Plan for Haizhu Innovation Bay (Lizhu District)" was approved by the Guangzhou Municipal People's Government, with a total land area of 807 hectares and a total construction volume of 10.63 million square meters. Among them, Lizun Village's renovation range was 151.42 hectares (original survey area), with a construction volume of 4.3627 million square meters.
This meeting revealed that with the changes in the survey of Lizun Village, the renewal of policies such as the "Guangzhou Urban Trees Protection Management Regulations (Trial)" and the requirements of high -quality development issues, the current control requirements are optimized and adjusted.
The Lixian area is located at the junction of the high -quality development zone of the new city axis and the Pearl River coast. The planning range is 8 planning management units such as AH1017 ~ 24, with an area of about 581.90 hectares. The status quo within the scope of the planning mainly includes old villages such as Liyu Village and Shengjing Homeland, Pearl River Yujing Bay, CCCC Headquarters and other current residential and business office buildings, as well as the projects such as Zhongshan Second Hospital, Nantianhui, Maternal and Child Hospital, etc. Including old factories such as Guangzhou passenger ship company.
The area of collective rights within the planned scope is about 141.91 hectares, and the state ownership ownership is 228.62 hectares. The collective ownership is mainly Liyu Village (130.55 hectares). The state -owned authority involves many subjects.
Highlight the image inspiring vitality
Continue the place of the truth
The plan proposes that the main design strategies of the current control regulations will continue, and the planning structure will be the order structure of the axis. It is intended to build the ecological environment of Bishui Ban Bay, Tongjiang Lake, and ecological penetration, and improve transportation, build hubs, and reshape blocks in slow transportation. At the same time, the plan is planned to form a spatial form with high front and rear high, scattered, and clustered forms.
The overall vision is to use "digital economy integration scientific and technological innovation" to create a future -oriented new axis South Gate · Digital Science and Technology Bay. Planning will form three major consensus: continuing the urban axis and highlight the image of the portal; shape the innovative space and stimulate the vitality of the area; extract traditional elements and continue the venue.
One of the goals is the iconic, that is, the cluster of the new city axis landmark place; the second goal is the futuristic, that is, the future innovative vitality industrial center; the third goal is the firework gas, that is, the display window of the local life scene.
Planning 7 schools
10 kindergartens
How to strengthen the iconicity of the South Gate of the Central Axis? The new plan proposes two programs: 350 meters or 250 meters high in the core area of the core area. At the meeting, according to the opinions of the regional chief teachers, the core business district of Lizheng, as an important portal of the intersection of the southern end of the new central axis and the Pearl River, should be carefully studied.
The notice of the Ministry of Housing and Urban -Rural Development's "Strengthening the Management of Ultra -High -rise Construction Planning and Construction" clearly required, strictly restricting the newly built over 250 meters of super -high -rise buildings. In this planning suggestion, the height of the landmark building in the Lizhu area is not higher than 350 meters. program.
In addition, the need for planning improvement was revealed at the meeting. The first is to solve the new demands put forward in the implementation phase of the re -recovery area. During the implementation of Lizhen Village in the staging stages, due to the introduction of the guidance of high -standard facilities such as the “Guidelines for the Construction of the City Update Unit Facilities”, multiple functional departments put forward the requirements for strengthening the supply of public service facilities. For example, the education department put forward the requirements for high standards to allocate education facilities, and the power supply department proposes 2 new 110kV substations, and the health department proposes to configure 3 of the 6,000 square meter community health service centers.
After the planning and adjustment, the public facilities in the area covered 65 categories of eight categories, which were added 17 new control regulations, with a total of 342 places, and 117 new control regulations were added. At the same time, the planning education facilities are set up in accordance with the scale of no less than 94,600 planning population. The scope of the planning is equipped with 1 full middle school, 1 in 51 classes in the nine -year consistent school, 5 primary schools, and 10 kindergartens. It basically meets the demand and service radius of the area.
- END -
Great Meimei Frontier | Southern Xinjiang "Net Red Village" is spreading in the "Poetry and Far Boys"
On the hot summer, under the grape rack of the farmhouse of the desert oasis villa...
In the first half of the year, the city's ecological water replenishing 1.14 billion cubic meters to create a modern water ecological pattern
Since the beginning of this year, the city has actively coordinated the water tran...