The construction of the ground park is launched, and the main structure of the first full -buried underground regeneration water plant in Hubei
Author:Changjiang Daily Time:2022.08.12
The Yangtze River Daily Da Wuhan Client August 11th. On August 11, with the pouring of the last concrete top plate at the scene, the main structure of the main structure of the Wuhan Yangtze River New District of Wuhan Yangtze River New Area, which was established in the China Central Enterprise Enterprise Second Airlines Bureau, was officially capped. It marks that the project has entered the equipment installation and commissioning and the construction stage of the ground urban park. The project is also the first full -buried underground regeneration water plant in Hubei Province.
The main structure of the Daijiaji Regenerative Water Plant in the Yangtze River New District was capped. Correspondence
The total area of the Daijiaji Regenerative Water Plant in the Yangtze River New District is about 67,000 square meters. The water plant is one of the major people's livelihood projects in the Yangtze River New Area that is the first to launch a double -layer cover structure on the underground floor.
Compared with ordinary sewage treatment plants, the water quality standards for recycled water plants are higher, and the full -buried construction has also greatly improved resource utilization.
Aerospace map of the Yangtze River New Area Xijiaji Regenerative Water Plant Project. Correspondence
The reporter from the Yangtze River Daily learned that the regenerative water plant will adopt a new type of water treatment technology combined with the most advanced MBR process in China -the active sludge method and membrane separation technology. The area is small, the sludge is old, the sludge emissions are small, and the secondary pollution is light. The water output standard reaches the surface water category. Essence
The construction area of the regenerative water plant is in the high -speed rail line and Zhujiahe's encirclement. During the construction cycle, two flood prevention periods are spanned. The excavation of the foundation pit is 18 meters deep, about 201 meters long, and about 158 meters wide. "In order to prevent the collapse and surge in the foundation pit, the project has laid 123 vice -ground walls in the early days of construction." Said the person in charge of the project in the Tongjiaji Renewal Water Plant in the Langhang New District of China Communications.
As the main structure was capped, the construction of the ground urban park of the Dajiaji Renewal Water Factory opened simultaneously. The ground park will improve the surrounding living environment in the future, and residents can leisure for a few minutes. The park plans to have entrance welcome areas, wetland stack areas, sunshine activity areas, dynamic sports areas, and comprehensive office areas. The green space rate reaches 67.5%, and can absorb about 1,000 tons of carbon dioxide each year. Combined with the underground sewage treatment system, it will realize the dual environmental protection system of ground underground.
The project is planned to be completed this year. In the future, it will form a sewage treatment system of the Yangtze River New District with the three -in -one Yangtze River New Area in the Yangtze River New District with the Wuhu sewage treatment plant and the Yanglu sewage treatment plant. It is expected to reach the scale of 140,000 tons of water resources in 2035 Serve 240,000 people in the area. (Changjiang Daily Reporter Gong Ping Correspondent Zheng Liwei Song Yue Meng Zhang Hengkun)
[Edit: Deng La Xiu]
For more exciting content, please download the "Da Wuhan" client in the major application markets.
- END -
"Epidemic" line "Transferler": Just for the original intention and mission
Faced with this round of epidemic, the Xigu District epidemic prevention and contr...
Zhuzhou Economic Development Zone launched a sanitation "large cleaning and great rectification" operation
Huasheng Online News (Correspondent Yi Xu) In order to fully promote environmental...