Huangshi 315 Provincial Road and River Gold Line Reconstruction Project is promoted in an orderly manner

Author:Hubei Highway Time:2022.08.11

On August 8th, the first phase of the Yellowstone Development Zone of the 315 Provincial Highway 315 was officially opened to traffic by 14.844 kilometers (Jinhai to Datang Section).

315 Provincial Highway River Golden Line, the starting point is located in Hekou Town, Sicai Mountain, and via Weiyuankou, Jinhai, Prince, King, Dazupu, Jinhu, Chen Gui, Lingxiang and other towns (streets). Jinniu Town is the "one horizontal" in the "six vertical, six horizontal and one couplet" of the ordinary trunk road network of Huangshi City. Foreign traffic.

In order to meet the continuous expansion of traffic needs of the economy and society, better serve the economic and social development along the line, and further improve the function of regional road network layouts and the collection of Huangshi Xingang's collection and transportation channel. The upgrade and reconstruction work started planning and construction since 2018. Based on the principle of reconstruction of a period of maturity, the principle of forming and opening to traffic one by one, the 2.328 kilometers of Xisai Mountain Section, and the Weiyuankou section of the Xingang Park in 6.588 kilometers were completed and opened to traffic at the end of last year and July this year. The construction of the Qipanzhou Bridge and other plays the role. Coupled with the first phase of the development zone section of this traffic 14.844 kilometers, the 315 Provincial Highway Reform and Expansion Project has been opened to traffic for 23.76 kilometers. Essence

The planning department of the Huangshi Highway Business Development Center introduced that from the estuary to the Dabopu section of the 37.281 kilometers of 315 provincial highway reconstruction and expansion projects, the entire section of the new construction and reconstruction method was adopted. And the first -level highway standards of 24.5 meters are renewed and expanded. This project is not only an important part of the "Huangxian Transportation Channel", but also an important dredging road in Huangshi New Port. It is also an important main road of traffic in the development zone and Daeye.

It is reported that the new line of the 315 provincial highway that has been opened to traffic starts from the Xisai Mountain River embankment of the original 203 Provincial Highway. After wearing the Boipan Bridge connection line, after the three -dimensional crossing of the Huangyang Highway on the Huangyang Line 412 Provincial Highway 412, it stopped at the old 315 provincial highway near Datang Town, with a total length of 23.76 kilometers. There are 14 new bridges, and there are dozens of structures such as box culverts, round management culverts, and lid -board culverts along the line.

The Development Zone · Tieshan District Construction Bureau introduced that the first phase of the Huangshi Development Zone project in the 315 Provincial Highway started in Zuojiapu Village, Jinhai Management Zone. At the junction of the new and old 315 provincial highway in Kezhen Village, Da Wang Town, the two -way one -kilometer standard of two -way four -lane and one -kilometer is adopted. The design speed is 80 kilometers per hour. The duration of the Yangxin area is not only convenient for residents along the route, but also will effectively promote the economic and social development of Jinhai, Prince Town, and Wang Town, and accelerate the process of urban and rural integration.

- END -

Rao Guoping, the former president of Xinjiang Branch, was investigated and retired in April

Zhongxin Jingwei, July 6th. The website of the Central Commission for Discipline Inspection Commission reported that according to the State Discipline Inspection Commission's State Administration of D...

1 Labrado is tied to the pillars of the temple, and after seeing the clear clearly:

Today, many pets have become fat and sturdy under the owner.It has even reached th...