The Institute of Electrical Sciences successfully built the first set of Inner Mongolia grid full -performance test platform
Author:Heze Daily Time:2022.08.11
In August 2022, the Inner Mongolia Academy of Inner Mongolia's high -voltage test hall built in the High -voltage Test Hall of Helin Electric Power Park was successfully accepted and put into use in the field of high -voltage test technology and digitalization in the Inner Mongolia Academy of Inner Mongolia Electric Sciences A major breakthrough was achieved.
This test platform is a comprehensive test platform that integrates the first set of intestinal sensor parameter analysis, bureau release test, and pressure resistance testing. The platform is built in the high -voltage hall shielding laboratory, which can effectively reduce the background volume, reduce the impact of external environmental changes on the test, and make the results of the bureau more accurate. The connection between the rotating platform and the integrated device is tight and heavy in terms of construction period. When multiple transformers are required, there is no need to consider the movement of the device, and it will not cause the confusion of the wiring. Increase work efficiency. At the same time, it can be shielded to the outdoor computer communication control device to complete a number of tasks such as remote lift and pressure control, real -time monitoring of test data, and automatic generating test reports. Highly automated operations have greatly ensured the convenience and security of the test.
The High -voltage Institute of the Institute of Electric's Science and Technology Relying on the key science and technology tasks, in the spirit of continuous innovation, successfully built a safe, stable, and fast transformers test technology platform, providing a more scientific and accurate test process for the intestinal test, and realizing the scientific and technological results direction of the scientific and technological results. The transformation of real productivity has laid a solid foundation for the analysis and application and related technical research of the later intestinal test data.
Source: Inner Mongolia Electric Power (Group)
- END -
Corqin District precise efforts to ignite new formats and new employment group party building high -quality development engines
Since the beginning of this year, Corqin District has paid close attention to the new business format and the new employment group party building and development shortcomings, actively explored and ta
Hunan increased rainfall 116 times in July.
Since July, high temperatures have continued to be online, and weather droughts have appeared in our province. The reporter learned from the Provincial Meteorological Bureau today that in response to