Dandong's potholes are changing!Convenient for 2500 residents
Author:Yalu River Evening News Time:2022.08.10
At 9 o'clock on August 4th, near the intersection of Sidao North Street and Binjiang Road, Dandong, Liaoning, cooperating with mechanical operations, workers are undergoing underground pipe network construction. According to the person in charge of the Urban Construction Section of the Municipal Housing and Construction Bureau, which viewed the construction progress on the spot, the project that was under construction was the long -awaited project of nearby residents.
"You see this road downstairs, there are still people who fell because of this road last year." Pointing at the foot of the feet, Mr. Wang, a nearby resident, told reporters that he moved from the early 1990s to the nearby nearby nearby nearby nearby near the nearby 1990s. Living, due to the years of disrepair, multiple damage occurred on the road, causing inconvenience to residents. "Most of the residents near us are the elderly. The old arms and legs are not practical in such a road. We look at many communities to transform roads. We also look forward to it every day." Mr. Wang said.
What the residents are looking forward to are the focus of the project construction. The construction scope is mainly concentrated around the Yellow Hai and North Plant Communages. The total area of asphalt roads on the entire construction process is about 22,000 square meters, the total area of the sidewalk tiles is about 26,000 square meters, a total of 4179 meters of sewage pipes are laid, and 500 sewage inspection wells are added and 41 septic tanks are added. The project involves 42 residential buildings, and about 2,500 residents benefit.
In order to better and convenient construction, the entire project will be carried out in three pieces according to the area. Among them, the drainage project on the upper section of Beichang Mountain will be applied to about 3000 meters of plastic steel wrapped ripples, 22 septic tanks, 357 wells and sewage wells. With a structural trail of nearly 20,000 square meters and setting 4143 meters on the roadside. In the lower section of the northern factory, the drainage project will be applied to about 1,500 meters of plastic steel wrapped ripples, 12 new septic tanks, 125 wells and sewage wells, and 86 rainwater wells. Mi, with a structured trail of 4,000 square meters and setting 500 meters of border stones. The drainage project of the South Factory Community will be applied to about 700 meters of plastic steel wrapped ripples, and 4 septic tanks are set up, 81 of the well rooms and sewage wells. The road engineering part will be laid 5,200 square meters of asphalt pavement and 2,200 square meters with a structural trail.
"We look at the progress every day. With such a hot day, the workers sweat every day. After lunch at noon, we will come back to build, and they will solicit our opinions. We are all moved." Mr. Lin, a nearby resident, said. The person in charge of the Urban Construction Section told reporters that before the construction, the Municipal Housing and Urban Construction Bureau will be conference to the residential area to solve the opinions of residents. There is no guardrail on the mud wall like some locations. The septic tank has a taste, and the construction unit designs the position of the septic tank in the farthest area within the construction scope when conditions permit.
It is reported that the entire project entered the market on July 20 and is currently underway. It is expected to be completed on November 30 this year.
Supply | Wang Zining Qi Wen Group | Cai Mengmeng
- END -
"Industrial Strong City, Industrial Xingshi" Zaozhuang City Industrial and Information Bureau five measures to promote the high -quality development of the entire civic economy economy
Luwang, July 15 (Reporter Du Wei, an apprenticeship reporter Li Yanqi) On the morn...
Camping, night tour, water and land, flowing flowers ... Flower Bohui a lot of new play
The Yangtze River Daily Da Wuhan Client August 3 (Reporter Ye Feiyan Correspondent...