Construction of a beautiful Yanta | Yanta District Establishing Water Supply and Power Supply Archives
Author:Yanta Rong Media Time:2022.08.10
On the evening of August 9th, the Yanta District established an emergency response to the water supply and water supply and supply and supply of water supply to further strengthen the safety of the peak summer and hydropower supply.
According to the deployment of provincial and municipalities, the Yanta District Water Supply and Power Supply Architecture Emergency Assault Team uses the main leaders of the district government as the captain. people. They clarified the list of members, work mechanisms, work content and work requirements, and cooperated with the professional repair forces of the power and water department to ensure that the work joint forces were formed at the first time, and the normal supply was restored in the shortest time.
The District Housing and Urban Construction Bureau incorporated the relevant personnel into the hydropower pipe network repair group, the property community confession group, and the construction site protection group. Based on their respective functions, we went to the community property companies and construction sites to strengthen supervision and supervision, and carry out hydropower supply. The property community guarantee group rushed to various community property companies to urge them to do a good job of water supply and supply guarantee, and organize property companies to strengthen duty on duty. At the site of the Tianji Sunshine Project of Zhanglianzhai Street, the staff Yu Xiaolong was inspections and urged construction enterprises to implement emergency responsibilities.
The District Urban Management Bureau clarifies sanitation, greening, machine sweeping and cleaning the water supply and emergency protection tasks of cleaning companies, ensuring that personnel and vehicles are in place as soon as possible, keeping the vehicle water tank clean, standardizing water picking, providing water delivery, strictly abide by the safe red line, obeying unified scheduling. Ensure that emergency water supply operations are safe and efficient.
Each member unit performs his duties and has a division of labor and cooperation to strengthen the 24 -hour duty system. The competent departments of various streets and industries monitor the power load in real time, and conduct investigations of hidden dangers of hidden dangers for residents. At the same time, establish a government -enterprise linkage mechanism and repair working mechanism with municipal departments, and make emergency preparations at any time. With the sense of responsibility of "rest assured", we will go all out to ensure the order and health and safety of the people in the jurisdiction.
- END -
The Jiqing high speed was closed twice within a month, just to make this "big block" go all the way all the way
The Jiqing high -speed high -speed is closed twice within a month, just to make th...
What signals are revealed behind the province's seventh Ziyang project work meeting
A total of 1,460 major projects, with a total investment exceeding 1.1 trillion yuan ... On June 7, Ziyang City held a city's major project reserve work meeting to announce the basic situation of loc...