Guangrao Renmin Road is fully closed!How to transform it?Poke in and see!
Author:Ai Guangrao Time:2022.08.10
News about Sunwu Lu's closed construction and reconstruction
Treating the attention of many citizens
Guangrao Sunwu Road is closed and transformed! How to transform it? Look at the effect map in advance!
As a transformation of rain and diversion in the county town of Guangrao County
Part of the project and the improvement of waterlogging capacity
As the first batch of construction roads, Sun Wulu
Stress construction
(August 9)
The second batch of construction sections
Renmin Road (County Comprehensive Law Enforcement Bureau -Sun Wu Road Section)
Construction has also been fully closed
↓↓↓
Announcement
Regarding Guangrao County City Make-up Ecological Protection and Improvement Project-Announcement of the Construction of Rain and Switting Projects of Rain and Policy of Rain and Policy in Urban Area
With the approval of the relevant departments of the superiors, the implementation of the shortcomings and ecological protection and improvement project of the city of Guangrao County-The implementation of the rain and diversion transformation and the improvement of waterlogging resistance in the urban area (Renmin Road Rain Disization Project) must be implemented. ) Perform all -closed construction. The closed time is from August 9, 2022 to October 25, 2022. If the construction delays are delayed due to force majeure, the road closure time is postponed. At that time, the passengers and pedestrians are requested to drive or choose roads by the traffic prompts (綦 Highway, Guangle Road, Le'an Street). During the closed period, the vehicles and pedestrians are prohibited from passing. Special announcement!
August 5, 2022
According to the editor
Renmin Road is the city's secondary road
It is an important path for Guangrao traffic
This section of the road is completed for a long time
The road structure is weak
Penal vertical and horizontal cracks
There are many diseases such as rutor, local collapse and other diseases
Part of the road
Cracking and inverted seriously
Seriously affect road safety and safety and
Overall effect
Project summary:
It mainly includes the main road roads and sidewalk transformation, rain and pollution pipe networks and water supply pipelines, street light replacement installation, transportation fence replacement installation, road traffic canal, greening and so on.
△ Construction area map
Main design content
1
The main road renovation: from the east Sunwu Road, the west to the law enforcement bureau to dig out the main road structure of the road, and create a new asphalt concrete road and replace the road.
2
In addition to the recent laid roads, the sidewalk structure on both sides of the main road is excavated, and the sidewalks and roads are newly created.
3
Local optimization and transformation of traffic canal with the intersection of Bing Sheng Road and Yuehe Road to meet the requirements of motor vehicles, pedestrians, and non -motorized vehicles.
Effectiveness of engineering construction
After the project is completed, it can effectively improve the efficiency of urban domestic sewage collection, supplement the shortcomings of drainage facilities in urban areas, and realize the full coverage, collection, and full treatment of the sewage pipe network in the urban area, consolidate the effectiveness of urban black and odorous water bodies, improve the quality of urban water environment, enhance the quality of urban water environment, enhance the quality Urban drainage and waterlogging and prevention, alleviate urban waterlogging problems, meet the needs of urban development and the people's expectations for a better environment.
Xiaobian reminds again
Recently due to engineering construction needs
There are many closed construction sections
Please pay attention to bypassing
Building a comfortable and livable Guangrao
It is our common wish
More everyone's understanding and support
May Guangrao be better tomorrow!
- END -
Huafeng Chemistry: It is expected that the net profit in the first half of 2022 is 2.2 billion to 2.4 billion yuan, a year -on -year decrease of 37.67%~ 42.87%
Every time AI News, Huafeng Chemical (SZ 002064, closing price: 7.96 yuan) release...
Yueyang two candidates in August 2022 "Hunan Good Man"
On August 8th, the candidate for the Hunan Good Man candidate for August 2022 kick...