There are multiple bus lines to adjust citizens to pay attention to travel

Author:Hohhot Evening News Time:2022.08.09

The reporter learned from the Hohhot Public Transport Co., Ltd. that since August 7, the S14 and S16 roads have been canceled, and roads 14 and 108 are optimized to restore the original operation of the 84th line.

Due to the departure from China Unicom Cloud Data Industry Park, S14 Road passes through the North Second Ring Road, Zhandong Road, Dongying Road, overlap with multiple routes such as 32, 3, 102, 19, 27, K1, and other lines. There are more roads with routes 301 and 110, and there are fewer passenger flow in these two routes, so the S14 and S16 are canceled.

In addition, the terminal 14 is the fourth prison in Hohhot. The 108th and 14th routes are heavy. The 108 Road can almost cover the 14th route. The demand for the 14th and 108 pavilions is relatively small. Therefore, the optimization is integrated into a line. After the optimization and integration, the reserved 108 route also passed through the fourth prison of Hohhot, which has a small impact on the original line.

Due to the reconstruction of the pipeline network of Civilized Road and Shandan Road, the road has the conditions for bus traffic, and the 84th route has resumed the original line operation.

Source: Hohhot Evening News reporter Su Rina

Coordination/Liang Jingyuan School Reading/Liang Jingyuan Preliminary Audit/Feng Bin Final Audit/Zhao Min

not

not

- END -

Speaking of civilized tree fresh wind | A family in the neighborhood

Source: Shijiazhuang Civilization Network

The total number of ships is more than 500?The US Navy's "2045 plan" sword refers to China!

[Global Times Special Reporter Chen Shan] After the Pentagon rendered the size of the Chinese Navy is the first in the world for a long time, the U.S. Navy finally launched a ambitious expansion pla