The latest notice of the Housing and Construction Department of Hebei Province!

Author:Hebei Radio and Television Sta Time:2022.08.09

Recently, the Housing and Urban -Rural Development Department of Hebei Province commissioned a third -party technical team to conduct random inspections on the construction site of 13 cities in the province (including Dingzhou, Xinji City) and Xiong'an New District. Notify the results of the spot check and detection.

The report pointed out that there were 158 buildings of the building's cranes, including 101 tower cranes and 57 construction lifts. After inspection and testing, there are major hidden safety hazards from 11 heavy machinery (7 tower cranes and 4 construction lifts), which are distributed in 7 cities including Shijiazhuang, Zhangjiakou, Qinhuangdao, Langfang, Xingtai, Handan, Dingzhou, and 27 under construction. There are security issues in the process of 56 engineering projects in the process of heavy machinery.

Two -checks are found in two aspects: First, regular inspections and maintenance are not in place, and the construction site at the construction site has a poor use of mechanical use, there are greater safety risks, and there are even major safety hazards. With acceptance, there are still safety problems to detect qualified buildings, and daily inspections and supervision of rectification are not in place.

The Housing and Urban -Rural Development Department of Hebei Province requires that the competent departments of housing and urban and rural construction in various places shall review the rectification of hidden safety hazards and problems in all buildings, and to impose administrative penalties for responsible units related to unqualified buildings. Resolutely eliminate the hidden dangers of the construction of the building. It is necessary to strengthen the daily supervision of building lift machinery, make full use of the construction safety management information system of construction projects in Hebei Province, regulate the construction of the construction of mechanical filing, disassembly notification and registration of the construction, and supervise and guide the guidance to carry out the top upgrade and additional festivals, attachments, regularly attachment, regularly attachment, and regularly Check and maintain. It is necessary to supervise the subjects of all parties to establish and improve the safety management and control system of dangerous projects, and strictly control the construction of the building, the installation and use, the installation and implementation, and the acceptance of the construction of the building. During the daily supervision and inspection process, it was found that the property rights, installations, and use units of building lift machinery did not handle the filing, disassembly notification and use of registration procedures in accordance with regulations, or the installation unit did not perform self -inspection and did not go through the transfer procedures for the construction unit to the construction unit. If special operators have unlicensed jobs or hidden dangers of major accidents, they must be punished in accordance with laws and regulations.

The competent departments of housing and urban and rural construction in various places should increase the investigation and management of hidden dangers of building lifting machinery. The implementation of attachment, maintenance and other implementation of self -inspection and self -correction can be effectively eliminated. The construction of the building's lift machinery and the use unit are required to conduct a comprehensive inspection and maintenance of all buildings at the construction site before the end of August to ensure safe operation. The competent departments of housing and urban and rural construction in various places shall, in accordance with the requirements of the safety production governance operation of the housing municipal engineering project, combine the arrangements of the "look back" of hidden dangers to investigate and rectify the rectification of hidden dangers at the end of September, focus on inspection and inspection of the construction site building lift mechanical inspection, and resolutely prevent production safety accidents.

Test the list of unqualified buildings to take heavy mechanical safety hazards list

1. Project name: Shijiazhuang Jinzhou Mayor Ruiyang Huayuan Project (Phase II) Project

Raideling machine: 22#Tower -type crane

Hidden safety hazards: ① The switch box controls three electricity equipment at the same time, which does not meet the requirements of the specifications

② The driver's room is fixed and not firm

③ The fire extinguisher that does not meet the fire requirements of the driver's room

④ Rotating limiter failure

⑤ The lack of a promoter brake protective cover

⑥ inspection report

(Report number: DLT/TTWB2108060) The amplitude information does not match the actual situation on the spot

Raideling machine: 23#Tower -type crane

Hidden safety hazards: ① Basic waterless drainage facilities

② Change steel wire rope is not lubricated in accordance with regulations, and the number of broken wires exceeds the requirements of the specification

③ No red barrier lamp is installed at the end of the arm rack and the top of the tower

④ inspection report

(Report number: DLT/TTWB2108061) The amplitude information does not match the actual situation on the spot

2. Engineering name: Yanghe City Yanghe-Qingheyuan Resettlement House Construction Project

Raideline Machinery: 1#Tower crane

Hidden safety hazards: ① The vertical safety distance between the 4 tower and the 1#tower is less than 2m, which does not meet the requirements of the specification

② The anti -proof function of the climbing device is invalid

③ Some standard sections are connected to high -strength bolts without revealing the screw top plane 3x snail distance

④ Fire extinguishers that do not meet the fire requirements in the driver's room

3. Engineering name: Qinhuangdao City Qinglong Tomorrow Star City Phase I

Raideline Machinery: 1#Building Lifts

Hidden safety hazards: ① Emergency export electrical safety chain switch fails

② The electrical safety switch of the ground protection fence door is invalidated

③ The brake of the west side hanging brake is not sensitive

Raideline Machinery: 2#Building construction lift

Hidden safety hazards: ① The height of the free end of the rail frame exceeds the requirements of the instruction manual

② 2 lack of ground foot bolts

③ The connection of the cage and the transmission board is not installed with the sales axis, and the axis -oriented positioning of the sales axis is unreliable.

Raideline Machinery: 3#Building Construction Lifts

Hidden safety hazards: ① The first attachment support rod plastic deformation

② Some guide rack connection bolts are not exposed after tightness

③ Emergency export electrical security chain switch fails

④ Install the standard section of non -original manufacturing on the construction elevator without authorization

4. Engineering name: Phoenix City, Gu'an County, Langfang City

Raideline Machinery: 8#Building Project 8#Tower crane

Hidden safety hazards: ① Individual attached device through wall bolts do not meet the requirements of the instruction manual

② Individual attachment support rod connecting the sales shaft uses iron wire instead of opening sales. The axis of the axis of the sales axis is unreliable ③ The root hinge point of the arm is more than 50m, and the wind speed instrument is not installed.

④ The protective railing of the top -up work platform, the balancing arm protection railing is fixed and not reliable

⑤ The number of fixed ropes of the steel wire rope is insufficient, which does not meet the requirements of the instruction manual

⑥ Foundation without drainage facilities

5. Engineering name: Fifth Phasef Phase of West District, Guangzong Tianyi City, Xingtai City

Lifting Machinery: 5#Tower crane

Hidden safety hazards: ① Basic waterless drainage facilities

② Rotating limiter failure

③ The lack of a promoter brake protective cover

④ Individual attachment device through wall bolts do not meet the requirements of the instruction manual

⑤ Fire extinguishers that do not meet the fire requirements in the driver's room

⑥ Balanced red obstacle lamps at the end of the arm

⑦ The switch box controls three electricity equipment at the same time, which does not meet the requirements of the specifications

6. Engineering name: Handan Wanhao Shangye Project

Lifting Machinery: 4#Tower crane

Hidden safety hazards: ① The foundation pit has no timely cleaning of construction waste

② The attachment device is severely loose through the wall bolt loosening

③ The lifting of the lift -liftstorm restrictions is not effective to connect and fails

④ The starting weight limiter is not effective to be effective

⑤ The operating room has no insulation floor and the fire extinguisher that meets the fire requirements

⑥ Tower crane balancing arm platform steel mesh damage

The rope of the lift mechanism is severe

⑧ Unloading the power supply and the wrong phase protection device

失 Rotate the limit position failure

Lifting Machinery: 7#Tower crane

Hidden safety hazards: ① foundation without drainage facilities, basic accumulation of water

② Tower crane balancing arm platform steel mesh damage

③ Lisar -by -lifting torque limiter failure

④ Starting weight limiter failure

⑤ Rotate limiter failure

⑥ No power supply is not installed and the wrong phase protection device

7. Engineering name: Dingzhou Xuyang Xingfu City Phase II residential and commercial projects

Raiders: 3#-5#, 8#—10#residential building, underground garage (East District) 2nd section project 4#building construction lift

Hidden safety hazards: ① Some guide racks connected to bolt -free loosening measures

② Urgent export electrical safety switch fails

③ The protection door of individual floors is damaged

Test a list of qualified buildings to heavy mechanical safety issues

1. City name: Shijiazhuang

Engineering name: Xinhua District Cheng Phase II Phase 5#Plan (Phase II in the village of Dishicheng)

Raideline Machinery: 6#Tower crane

Safety issues: The setting of anti -climbing device is unreasonable.

Raideline Machinery: 8#Tower crane

Safety problem: The fire extinguisher that does not meet the fire requirements in the driver's room.

2. City name: Shijiazhuang

Engineering name: Phase II of the Old Factory area of ​​Metallurgical Research Institute of Chang'an District

Lifting Machinery: 2#Tower -type crane

Safety problems: The foundation pit has no miscellaneous objects that have not been cleaned in time.

Lifting Machinery: 8#Tower crane

Safety problem: a small amount of water in the foundation.

3. City name: Shijiazhuang

Engineering name: Mingshang Studies Project

Raipple machine: 5#, 8#Tower -type cranes

Safety problems: no drainage facilities.

4. City name: Chengde

Engineering name: Phase II Guanlan Capital Phase II

Lifting Machinery: 8#Tower crane

Safety issues: The driver's room is not equipped with fire extinguishers that meet the fire requirements.

Lifting Machinery: 15#Tower crane

Safety issues: The foundation has no timely cleaning, and the foundation has no drainage facilities; the driver's room does not have the fire extinguisher that meets the fire protection requirements.

Raipple Machinery: 17#Tower -type crane

Safety issues: The driver's room is not equipped with fire extinguishers that meet the fire requirements.

Raipple Machinery: 18#Tower -type crane

Safety problem: The top height of the tower exceeds 30m, and the red barrier indicator is not installed.

5. City name: Zhangjiakou

Engineering name: Yanghe-Qingheyuan resettlement house construction project

Lifting Machinery: 5#Tower crane

Safety issues: The driver's room is not equipped with fire extinguishers that meet the fire requirements.

Lifting Machinery: 3#Tower Tower crane

Safety issues: The driver's room is not equipped with fire extinguishers that meet the fire requirements.

6. City name: Zhangjiakou

Engineering name: Meiju Banshan Garden Phase 1

Lifting Machinery: 4#Tower crane

Safety issues: The foundation has no timely cleaning and water accumulation, and the foundation has no drainage facilities;

Raideline Machinery: 8#Business House Tower Tower crane

Safety problems: no drainage facilities; the driver's room is not equipped with fire extinguishers that meet the fire protection requirements;

7. City name: Zhangjiakou

Engineering Name: Fenghuang City Residential District, Wei County

Raidering Machinery: 1#Residential building construction lift

Safety issues: There are no protective sheds on the ground inlet port; the foundation is not cleaned in time, and the foundation has no drainage facilities.

Raidering Machinery: 5#Residential Building Construction Lifts

Safety problems: There is no protective shed on the ground inlet port; the emergency export electrical chain switch on the top of the hanging cage is invalid.

Raidering Machinery: 6#Residential Building Construction Lifts

Safety issues: There are no protective sheds on the ground inlet port; the foundation is not cleaned in time, and the foundation has no drainage facilities.

Raidering Machinery: 12#Residential Building Construction Lifts

Safety issues: There are no protective sheds on the ground inlet port; the foundation is not cleaned in time, and the foundation has no drainage facilities.

8. City Name: Qinhuangdao

Engineering name: 3-1 plot of the old city renovation project in the western part of Harbor District

Lifting Machinery: 6#Tower crane

Safety problem: The root hinge point of the arm is more than 50 meters, and the wind speed instrument is not installed. Engineering name: Future Center

Lifting Machinery: 1#Tower -type crane

Safety problem: Red disorders lack (front end of the lifting arm); the root hinge point of the arm is more than 50 meters, and the wind speed instrument is not installed.

Raideline Machinery: 2#Tower Tower crane safety problem: Red obstacle lamp lack (front end of the lifting arm).

9. City Name: Qinhuangdao

Engineering name: Qinhuangdao Jinmeng Bay No. 2 House Project No. 2 Building No. 1 Building 1

Lifting machinery: C, C, underground garage area 3 tower crane crane

Safety problem: The root hinge point of the arm is more than 50 meters, and the wind speed instrument is not installed.

Raideling Machinery: Land B Construction Lifts

Safety problem: The lack of the foot plate around the top of the hangers.

10. City name: Qinhuangdao

Engineering name: Tanghe Fujun (Phase I) Project One Bid Section

Raideline Machinery: 1#Building Lifts

Safety issues: Protection measures to prevent cable injury during unst or installed work.

11. City name: Tangshan

Engineering name: EPC general contracting

Raideline Machinery: 1#Tower crane

Safety issues: Basic accumulated water.

12. City Name: Tangshan

Engineering name: Phoenix Xingxun Project Phase 1 Standard Section

Raideline Machinery: 1#Tower crane

Safety problem: Basic water -free drainage facilities.

13. City Name: Tangshan

Engineering name: Lizhou City Glorious Construction Project (Phase I)

Raideline Machinery: 11#Building Construction Lifts

Safety issues: The emergency export electrical safety chain switch on the top of the hanging cage is not sensitive.

Raideline Machinery: 12#Building Construction Lifts

Safety problems: no drainage facilities.

14. City Name: Langfang

Engineering name: Zhonghai Platinum Yue Period

Raipple Machinery: 17#Tower -type crane

Safety issues: The driver's room is not equipped with fire extinguishers that meet the fire requirements.

Raipple Machinery: 16#Tower -type crane

Safety problems: no drainage facilities in the foundation, and the debris is not cleaned.

15. City name: Tangshan

Engineering Name: Di Jing Huafu Phase I Project

Lifting Machinery: 8#Tower crane

Safety problems: no drainage facilities; the height of the root hinge point of the tower machine exceeds 50m, and it is not equipped with a wind speed instrument.

Raideline Machinery: 8#Building Construction Lifts

Safety issues: There is no protection measures to prevent cable damage during the construction lift.

Raideline Machinery: 2#Building Tower Tower crane

Safety problems: no drainage facilities.

Raideline Machinery: 2#Building Project Construction Lifts

Safety issues: Attachment and guide racks are connected to the U -type card without anti -loose measures.

16. City name: Baoding

Engineering name: Baoding Maoyuan Community

Raideline Machinery: 9#Tower (17#Building) Tower crane

Safety problems: no drainage facilities, basic accumulation; the root hinge point of the arm is more than 50 meters, and the wind speed instrument is not installed.

Raidering Machinery: 17#Building Lifts

Safety problem: There is no safety operating procedure in the hanging cage.

17. City name: Baoding

Engineering name: Four -bid sections of the General Contracting (EPC) of Shenzhen -Baojiayuan Project Design and Construction (EPC)

Raideline Machinery: 26#Building construction lift

Safety issues: no drainage facilities, basic accumulation.

18. City name: Baoding

Engineering name: Smart terminal technology industrial park (productive service industry) project

Raidering Machinery: 27#Mobile Intelligent Terminal Technology Building Construction Lift

Safety problem: The mechanical lock device of the ground protection fence door is damaged.

19. City name: Xingtai

Engineering name: Xingtai Rong Media Building Project

Needlement machine: tower crane

Safety issues: The foundation of foundation pit has not been cleaned in time.

20. City name: Xingtai

Engineering name: Fifth Phase 5 of Tianyi City West District

Raideline Machinery: 2#Tower crane

Safety problem: The torque limiter fixed code variable electric shock and control the fixed -size variable contacts are not set separately.

21. City Name: Xingtai

Engineering name: Third Phase of Xingtai College Campus Construction Project

Raidering Machinery: Experimental and Engineering Center Construction Lifts

Safety issues: foundation and no drainage facilities around the surrounding; the protection measures to prevent cable damage from being installed in the construction lifting machine.

Raidering Machinery: Construction Lifts on the South side of the Experiment and Engineering Center

Safety issues: foundation and no drainage facilities around the surrounding; the protection measures to prevent cable damage from being installed in the construction lifting machine.

22. City Name: Xingtai

Engineering name: Tsinghua Garden · Hefu Project

Raideline Machinery: 1#Building Lifts

Safety issues: overload protection devices are not sensitive.

Raideline Machinery: 2#Building construction lift

Safety problems: no drainage facilities around the foundation.

23. City Name: Xingtai

Engineering name: Golden Bull Sunshine Garden West District II Project

Raideline Machinery: B3#Building Construction Lifts

Safety issues: The foundation has no timely cleaning and no drainage facilities; the construction lifting machine transmission mechanism and the axial positioning of the sales of sales are unreliable.

24. City name: Handan

Engineering name: Outpatient, medical technology, ward comprehensive building project in Handan City Seventh Hospital

Lifting machinery: Tower crane safety issues: basic accumulation.

Holming machine: construction lift machine

Safety issues: Protection measures to prevent cable mechanical damage in work without work.

25. City name: Handan

Engineering name: Baijia New Town S7 plot (Intime Thailand Xiangyuan) project

Lifting Machinery: 3#Tower Tower crane

Safety problem: The fire extinguisher that does not meet the fire requirements in the driver's room. 26. City name: Handan

Engineering name: Handan Maternal Maternal and Child Health Hospital relocated project ward building

Raise Machinery: Western Construction Lifts

Safety problem: The electrical safety chain switch on the top of the hanging door is not sensitive.

27. City name: Dingzhou

Engineering name: Shangdong College Phase I Project

Raipple machine: 6#, 7#Tower -type cranes

Safety problem: The top height of the tower exceeds 30 meters, and the red barrier indicator is not installed.

Raise machine: 1#, 2#Tower -type crane

Safety problem: The driver's room is not equipped with a fire extinguisher.

Raipple machine: 5#, 8#Tower -type cranes

Safety problem: The driver's room is not equipped with a fire extinguisher.

Raideline Machinery: 1#Building Lifts

Safety issues: No dedicated switch box is set.

• Recommended video •

- END -

Fifth of the "Three Cities" construction of "Three Cities" in Bao'an Distri

Urban renewal daily crescents, road traffic is orderly, civilized fashion infiltra...

Hechuan District launched a series of centralized publicity weeks of food safety publicity weeks of 2022

On July 12, Hechuan District, Chongqing City held a new development of food safety...