The failure of the eight -pass vehicle in the Beijing Metro Line 1 has been repaired, and the operation has gradually recovered
Author:Global Times Time:2022.06.17
At present, the failure has been repaired, and the operation order is gradually recovered.Passengers can inquire about delay inquiries on the official website of the Beijing Metro, and passengers affected by faults can find staff at the station to apply for a refund.
Earlier,@此 此 此 此 said that the Bayong Line 1 of the Metro Line 1 (driving to the Global Resort) at Baliqiao Station was late due to vehicle failures.Please understand the inconvenience.
Source:@来 来
- END -
Yongji Municipal Meteorological Bureau to relieve rain and blue warning [Class IV/General]
Yongji Meteorological Station on June 10, 2022 at 8:12 at 8:12 on the heavy rain blue warning signal, early warning area: all towns (streets)
Starting from the 25th, traffic control in some sections of Haru high -speed speed
Daily News · Life Daily reporter learned from the Highway Administration of the H...