Rotating the pile pile side flipping one person being trapped in Haikou fire to quickly break the rescue
Author:International Tourism Island B Time:2022.08.08
Commercial Daily All -Media (Coconut Network/Altitude journalist Li Xingmin Correspondent Wang Pengyu Zhang Yilin Photography Report) At 18:14 on August 7, the Haikou Fire Rescue Detachment Command Center received an alarm of the masses, which is located in Guilinyang Hai Tao Avenue, Guilin District, Meilan District. A rotary pile driver on the construction site near the intersection of the learning road occurred. Some people were trapped and needed to rescue. After that, the Haikou Fire Rescue Detachment immediately dispatched the fire station rescue personnel to carry out rescue work.
After the fire rescue workers came to the scene, they learned that a rotary pile driver suddenly collapsed due to the soft soil and the ground suddenly collapsed. Some of the trapped persons were compressed by the deformed operating rod and compartment, and the glass of the cab was broken. Because of the rain on the day of the incident, the surrounding area was mostly loose, and it could collapse again at any time, which increased the difficulty of rescue. Fortunately, the trapped persons are conscious and can also actively communicate and cooperate with the fire rescue personnel. In this regard, fire rescue workers immediately formulated a rescue plan, transferred two 120 -ton cranes to the opposite side of the vehicle to fix them, and adopted protective measures to protect the trapped persons. The damage is required to evaluate the physical condition and psychological intervention of the 120 staff.
In order to ensure safety and prevent the car from being squeezed and deformed again, fire rescue personnel use hydraulic rescue tools to expand the indoor space. As the rescue time passed, the trapped person began to have emotional anxiety and the physical condition gradually deteriorated. During the entire rescue process, fire rescue workers have been communicating with the trapped persons to encourage trapped people. After intense rescue, after the cab was sufficient to rescue the trapped personnel space, 120 staff members immediately checked the body of the trapped persons. After confirming the rescue of the trapped person, the fire rescue personnel will not be rescued and handed over to 120 for treatment when the trapped person is not caused by the rescue person.
Haikou Fire reminds that with the recent rainy weather in Haikou, the slippery ground will endanger construction safety, and it is easy to cause casualties. It is the key to prevent prevention in advance. Before construction, we should investigate and survey the necessary geology, hydrology, and underground pipelines, take safety protection measures, safe production, and alarm bells.
[Editor in charge: Huang Peiyu]
[Content review: Chen Songmei]
Copyright Statement: Copyright works such as the International Tourism Island Business Daily Commercial Daily, pictures, videos, audio and other copyright works. Welcome to repost, but the consent of the written authorization of this newspaper is strictly forbidden to include but not limited to reprinting or adaptation, citations, etc. responsibility.
Complaint Tel: 0898-65818181
- END -
The water level of the Three Gorges Reservoir disappears to the flood limit water level to face the
Xinhua News Agency, Beijing, June 9th (Reporter Hou Xuejing) Reporter learned from the Three Gorges Group on the 9th that at 16:00 on June 9, the water level of the Three Gorges Reservoir smoothly di
Tax refunds, rents and exemptions, social insurance premiums have been slowed ... Have you enjoyed t
Talk about your situation and suggestionsYour feedback helps track and understand ...