The National Defense Office Emergency Management Department urged the implementation of the responsibility for the implementation of the flood prevention
Author:Hebei Radio and Television Sta Time:2022.08.08
Since June 27, the Liaohe River has been over the police for 43 days. According to meteorological predictions, in the next three days, rainfall in northern Shaanxi, Shanxi, central southern Hebei, and Shandong, the rain areas overlap with the early stage, and the flood prevention situation in the north is not optimistic. On August 8th, according to the requirements of Wang Xiangxi, deputy commander of the National Defense General Defense and Secretary of the Party Committee of the Emergency Management Department, the National Defense General Office and the Emergency Management Department further deployed the flood prevention and flood resistance of the Liaohe River Basin and the surrounding Yanghe drainage work to urge relevant provinces Copy various tasks.
The National Defense General Office and Emergency Management Department emphasized that we must continue to focus on the Liaohe River Basin Super Police River to check dykes and flood prevention and drainage to ensure the safety of the Liaohe River. It is necessary to hurry up the surrounding Yanghe drainage operation, do a good job in the living security of the transfer of the masses, and restore the order of production and life in the disaster area as soon as possible. Related provinces in the north must attach great importance to the response of heavy rainfall prevention, and to compact the local administrative leadership responsibility for flood prevention, leadership slices and contract responsibilities, and engineering inspection defense responsibilities; Intelligent calls and other methods are delivered to the grassroots responsible person as soon as possible; it is necessary to urge the county and township to receive a discussion and judge immediately after receiving the meteorological warning, and start the emergency response in a timely manner according to the plan. The people such as the low -lying area along the river, the flood ditch, the hidden danger of geological disasters, and the lower reaches of the silt dams should be transferred to the masses, so that they should be turned all over and early; Pre -judgment of flood disasters seriously affect the regional pre -rescue rescue team and materials, coordinate and dispatch various types of rescue and rescue forces, refine action plans to ensure efficient disposal of emergencies.
At present, the two working groups of the National Defense Office are still instructed to assist flood prevention and flood resistance in Liaoning and Hebei Province. Professional teams and equipment dispatched by the National Defense Office and Emergency Management Department are carrying out drainage work in the Yanghe River. 53 mobile drainage pump trucks have been installed in the lower reaches of the Yanghe River, plus the original pumping station, with a cumulative drainage of 4.395 million cubic meters.
- END -
Nine in Jiangxi newly -positive infection of Nanchang in Jiangxi to implement epidemic prevention measures to return to personnel
The picture shows the orderly queuing of citizens in Nanchang in Jiangxi for nucle...
What is the disease and how to prevent cholera?One picture understands!
Source: People's Daily Client