Reporter tracking 丨 What is the problem of the manhole cover?Positive response
Author:Tianshan.com Time:2022.08.05
Pomegranate/Xinjiang Daily reporter Zhao Yue
Recently, Mr. Liang, a citizen of Urumqi, reported on the message board of "Pomegranate Cloud 12345 Ask" that the road of the South section of Kunming Road (Vanke Park in Vanke Park) was the new road. When the car passed, the sound of the manhole cover was particularly loud, especially at night. Can it be mute by the manhole cover?
On August 3, on the new road of the southern section of Kunming Road in Urumqi (section of Vanke Park), the fast -moving car will make a loud noise. Pomegranate cloud/Xinjiang Daily reporter Zhao Yue, Zhao Yue
On this issue, the reporter contacted the Urumqi Urban Authority (Administrative Law Enforcement Bureau). On August 3, Li Jun, Chief of the Municipal Pipeline Management Section of the Bureau, and Ma Xinjun, Chief of the Information Division of the Municipal Facilities Monitoring Center, and the road of the road The construction department of Urumqi High -tech Industrial Development Zone (New City) Construction Bureau (Transportation Bureau, Water Affairs Bureau, and People's Defense Office) staff on the ground survey.
In the east gate of the North District of the Community in the Kunming Road Vanke Park, along the Kunming Road, Li Jun and the High -tech Zone (New City) Construction Bureau (Transportation Bureau, Water Affairs Bureau, People's Defense Office) staff found 4 forces within 200 meters, and found 4 forces within 200 meters. The manhole cover that can be moved and emitted by stepping on the position is basically the same as the labeled in the photo of Mr. Liang.
On August 3, the staff of the Urumqi High -tech Industrial Development Zone (New City) Construction Bureau (Transportation Bureau, Water Affairs Bureau, and People's Defense Office) investigated the reasons for an exception sound in the southern section of Kunming Road (Danke Park). Pomegranate cloud/Xinjiang Daily reporter Zhao Yue, Zhao Yue
In response to the problem of the manhole cover, Ma Xinjun analyzed from a technical perspective: According to the relevant national technical specifications, the manhole cover used in Urban is mostly made of ball -ink cast iron, composite materials, etc., which are basically five anti -manhole covers such as defense displacement, anti -theft, anti -abnormal noise, etc. After the construction is completed, the sampling test will be performed. The road construction procedures on the southern section of Kunming Road have passed the acceptance and qualifications, and have passed the acceptance. The road section was completed in April 2020, and the shortcomings of the defect responsibility in April this year expired.
"After more than two years of use, the manhole cover has not been damaged, and there is no protrusion, settlement, deformation, etc. It may be that various reasons have caused the manhole cover and the well ring to be poor, which will cause abnormal noise in the vehicle impact. It belongs to the process of aging loss of normal municipal facilities, and it is recommended that the management unit replace it. "Ma Xinjun said.
"At the end of June, we have contacted the construction unit to add a pad to the manhole cover. Later, the construction unit was inspected and repaired for the second time, but the problem still exists. Now we will urge the construction unit to rectify again." ) The staff of the Construction Bureau (Transportation Bureau, Water Affairs Bureau, and People's Defense Office) said that after the processing of the processing of the two days, it will feed the public in the form of shooting videos.
In Urumqi, sound disturbance is only one of the problems in the manhole cover. "Some sections of the manhole cover are sinking or raised or even shifted. Driving is also very harmful to the wheels, and there are hidden dangers of driving." Said Ms. Lin, a citizen who lives in Tianshan District, Wushi.
As the person in charge of the management of municipal pipelines, Li Jun introduced that there are currently about 430,000 inspection wells in Wu City. The ownership is more than 10 units including power supply and fire protection. The daily maintenance runs the ownership units. Due to the large number of inspection wells, there are new and old in the construction period, and the level of control and protection of each unit is different. In addition, the roads of urban areas have been widening, which has "transferred" the inspection wells in the green belt and sidewalk to the middle of the road. There are many pipelines in the well in the well. There are many wells on the well, causing many manhole cover problems.
Ma Xinjun introduced that the staff of the monitoring center inspected every day and found the problem for 24 hours of maintenance.
Li Jun also said that the Urban Management Bureau (Administrative Law Enforcement Bureau) conducts inspection well rectification every year. Now the problem such as the settlement and protrusion of the well cover and the raised by Urumqi have greatly reduced. At present, Wu City is formulating inspection well maintenance and construction standards to maintain management with unified standards, thereby further reducing the problem of manhole cover.
In this regard, the reporter will continue to pay attention.
- END -
The beauty of the Song Dynasty is the peak of Chinese beauty
Photo | Northern Song Ru Porcelain Tianqing glaze jade pot spring bottle artery sha...
There are famous on the list!3 people in Hebei have won advanced models in recognition of the National Cultural Relics System
National Cultural Relics System Commendation Advanced Typical Typical3 units in our province were commendedA few days ago, the Ministry of Human Resources and Social Security and the State Administrat