Liaoning: Zhunzhi City City Flood Anti -Rescue
Author:Guangming Daily Time:2022.08.05
On August 1st, the surrounding rivers of Liaoning were stunned. Affected by the previous heavy rainfall, the Liaohe River was running high for a long time, and its tributary surrounding the Yanghe embankment had a dangerous situation. At the same time, according to meteorological predictions, in the next ten, the Northeast region will still be one of the main rainfall areas in my country. Among them, the rainfall in some areas in western Liaoning will reach 100 mm to 150 mm, and the local area will exceed 200 mm.
The upstream rain is not diminished, and the flood prevention situation is not optimistic. Liaoning Province immediately coordinated and coordinated the rescue forces and materials of all parties, and carried out the danger disposal work. The Ministry of Finance and the Emergency Management Department urgently pre -allocated 50 million yuan in the central natural disaster relief funds in Liaoning Province to support flood relief in the disaster area. The national rescue team assisted Xingye, performing the rescue and rescue mission of the dyke decision on the spot ... The ambitions became a city, and all parties remitted a joint force to rescue the floods on the banks of the surrounding Yang River in Panjin City.
There are the largest floods since hydrological records
This is the biggest flood since the Hydrological Record of the Yangyang River. On July 30, at Wanghui Wobao, Panjin City, the flow of the Yangyang River reached 1480 cubic meters per second, the largest since the establishment of the station in 1952.
The disaster is the command. Panjin City Flood Control Headquarters organized the rivers and districts and units along the coast of the river to patrol the dyke inspection and actively respond to it. It was timely investigated and found that various types of dangerous situations were found to be hidden in dangerous situations.
At 6 am on August 1st, a news made everyone like the enemy.
"The dyke pipe corridor on the left bank of the Yanghe River appeared severe water transparency, ending in the decision!"
The surrounding Yanghe embankment defense Panjin City is in the geological sinking area, and some embankment sinks 1.3 meters, and the flood resistance ability is weak. Under the guidance of the National Defense and Liaoning Provincial Defense Finger, Panjin City immediately launched the emergency response of flood control III, urgently mobilized 2680 people in various types of rescue personnel, dispatched 320 engineering vehicles and transport vehicles, and called 7,000 tons bags, wood, wood 3,000 piles, 150,000 woven bags, and 30 binds of iron wires and other flood prevention materials were put into rescue, but the dam was still collapsed at 10:30, the width of the collapse was about 20 meters, and the flood entered the country.
Central ground collaboration, fully support the disaster area
A difficult one, P Plus support. On the day of the danger of the surrounding Yanghe rhythm, the State Defense Office and the Emergency Management Department once again emerged from the Natural Disaster Project of the Natural Disaster Project of Tangshan Base (China Anneng No. 1 Tangshan Branch), Wuhan Base (China Anneng Third Bureau Wuhan Branch) backbone of the backbone) More than 210 rescue power, emergency mobilization of two helicopters to help the Panli Dyun Defense Pass to rescue the disaster relief.
The Liaoning Provincial Emergency Department coordinated four central enterprise engineering rescue forces and drone rescue teams to rush to Panjin to carry out rescue and rescue work. The main leaders of the Liaoning Provincial Party Committee and the Provincial Government went deep into the front line of flood prevention, organized and judged the flood prevention situation, and discussed measures. Liaohe Oilfield, Panjin Army Division, Armed Police Force, Panjin Fire Emergency Rescue, State Grid Panjin Panjin Power Supply Company, and China Anneng Construction Group Wuhan Company and other Wuhan Company coordinated and jointly participated in rescue and rescue.
On the morning of August 2nd, the width of the collapse expanded to about 50 meters; at 14 o'clock, after the relevant departments jointly discussed, the two -way defense line was launched, and the collapse was closed in a timely manner. Panjin City dispatched more than 1,300 armed police officers and soldiers, militia reserve personnel, and local rescue teams, and began to carry out the third line of defense.
The racing with the flood is only to grab two words- "peace". As of 15:00 on August 2nd, Panjin City had transferred a total of 1931 households and 8203 people, of which 6751 were transferred by themselves, and 1452 were centralized, which affected all the people in the region had been withdrawn, the oil well was closed, and no casualties were casualties.
Sleeping, grab the road of rescue
Beginning on August 1, the roar of the rescue equipment of the surrounding Yanghe's ruling mouth has not been cut off.
The dam of the surrounding Yanghe Dam is narrow, plus soaked by water for a long time, and soft and seepage on the road on the ground. The road about 1 kilometer on the north side has been flooded. The road on the right bank of the south side can only allow small vehicles to pass unidirectional. Large and heavy -duty repair equipment cannot enter the core area for repair operations.
The flood is aggressive, and one point is more dangerous, and the disaster relief channel is urgent. On the duck on both sides of the north and south sides of the ulceration, 74 people and 153 (sets) machines of the Natural Disaster Engineering Emergency Rescue Center (China Anneng Group) of the Emergency Management Department are being tightly constructed, sleepless, and in the north and south. In the end, a 20 -meter -wide and 30 -meter rescue operation platform will be built to provide road conditions for the collapsed stone.
At the same time, the "battle" that blocked the collapse was also ongoing. Starting from the night of August 2nd, the rescue team adopted the method of stone transfer to accelerate the repair process. Large vehicles uninstalled stone in the distance and transported stones from small and medium -sized trucks into the core area.
As of the afternoon of August 3, two -thirds of the dams have been repaired, and 20 new car platforms have been built. The rescue work is being promoted in an orderly manner.
(Reporter Liu Yong)
【Edit: Ye Pan】
- END -
It's about your pension and medical insurance!The latest voice of the State Council →
On the afternoon of June 17th, the State Council's June 17th held a routine briefing of the State Council's policy to introduce the relevant work of the people in difficulties and answered the reporte...
Father's love is silent!But support our sky
Zhejiang News Customer Supervision Lu Yan planned Huang Yihan Editor Wang Jinshu d...