Liaoning Panjin: The road paving has not been blocked by the collapse.
Author:CCTV News Client Time:2022.08.04
On August 1, the collapse of the Panjin Ringyang River Panjin section. As of now, the collapse has not been blocked, and the scene is being paved on the spot.
On the sides of the north and south sides of the ulceration, 74 people and 153 (sets) machines of the Natural Disaster Engineering Emergency Rescue Center (China Anneng Group) are under construction.1 road platform, 110 meters of repair roads, 9 cumulative construction platforms, and 2080 meters of repair roads.The north side is 80 meters of repair roads, 1 construction of the vehicle platform, and the accumulated paving repair roads 1450 meters, and 18 construction vehicle platforms.
At present, the road of about 1 kilometer on the north side has been submerged. The remaining 135 meters of embankment on the right bank on the south side can reach the collapse. It will build a 20 -meter -wide and 30 -meter rescue operation platform to provide road conditions for the collapsed stone to occupy the road conditions.Essence
(The reporter Wei Haoyan Yang Xue Yongjun Chi Bo when his army, Bo Yiyi, Jiang Zhengli)
- END -
There is no wife in his wife's cake, but there are really turtles in Guiling cream!
Buy the card first, then place orders, more favorableSummer is here, I guess you m...
"Save me!" The man suddenly received the information, and the next operation was too good
Police officer, save me! I can't move half of my body!At 11:24 noon on June 11, 20...