remind!Multiple road traffic control in Jilin City
Author:Jilin Daily Time:2022.08.04
Jilin Public Security Bureau Traffic Patrol Police Detachment on the construction of traffic control during the full road maintenance project
Jicheng Bus Tongtong [2022] No. 3
Due to the construction of a plump road maintenance project, from August 9th to August 16th, 2022, the absence of a plump road (west section of the mountains and river alleys to the Fugong Bridge) was implemented or half alternated. During the closed construction of the above sections, the vehicle can temporarily borrow the direction lanes, or bypass Chifeng Street.
announce.
Jilin City Public Security Bureau Traffic Patrol Police Detachment on the construction of some roads for some roads in Huai'an Road shall be implemented during the construction of traffic control
Jicheng Bus Tour [2022] No. 4
Due to the construction of some road sections of Huai'an Road, from August 9th to September 30th, 2022, Huai'an Road (200 meters on the north side of Jihua Power Second Factory) was closed. During the closed construction of the above sections, vehicles and pedestrians can be temporarily talked.
announce.
Jilin Public Security Bureau Traffic Patrol Police Detachment on the construction of Nanshan Street and other streets during the construction of the new Hongqi Bridge
Jicheng Bus Tongtong [2022] No. 6
Due to the construction of the new Hongqi Bridge project, from August 3, 2022 to September 1, 2025, the following road sections such as Nanshan Street and other streets will be implemented. The relevant matters will be announced as follows:
1. Nanshan Street (Wenshan Road to Jifeng East Road section) Central green belt is closed on both sides of the two sides of the green belt;
2. The motor lanes and non -motorized lanes and sidewalks on Nanshan Street (Jifeng East Road to Binjiang South Road) are closed. Vehicles and pedestrians can bypass Jingshan Street.
Third, the non -motorized lanes on the north side of Songjiang South Road (50 meters each of Jixing Catering) are closed.
During the closed construction of the above sections, vehicles and pedestrians are prohibited from passing. Please slow down and slow down.
Jilin Public Security Bureau Traffic Patrol Police Detachment on the construction of the rain drainage pipeline reconstruction project of some sections of Zhongxing Street during the construction period of the rain drainage pipeline renovation project
Jicheng Bus Tongtong [2022] No. 7
Due to the construction of the rain and drainage pipeline renovation project on some sections of Zhongxing Street, from August 9th to December 31st, 2022, the west side of the motor vehicle auxiliary lane and non -motorized lane on the west side of Zhongxing Street (Songjiang Bridge Bridge to the front of the National Fitness Center) Calcked. During the closed construction of the above sections, the deceleration of the past vehicles slowed down.
announce.
Source: Jiangcheng Daily
- END -
Summer limited!Wenchuan "Marshmallow" is online, it is worth having!
Blowing the cool windEscape from 35 ° C+heat wavesBreathing the refreshing air of...
Zhe'an County Meteorological Observatory lifted lightning yellow warning [Class III/heavier]
009, June 09, 2022, at 009:02, at 009, 2022, the lightning yellow warning signal was lifted.