Total investment is about 63.8 billion yuan!The latest progress from Yan'an to Yulin to Ordos high -speed rail →

Author:Yijin Hollow Banner Railway Me Time:2022.08.02

On August 1, the "Announcement of Environmental Evaluation Information of the New Railway Yan'an to Yulin to Ordos Line (Announcement)" announced on the Internet of Yulin City Government.

New railway

Yan'an to Yulin to Ordos Line

Environmental impact evaluation information announcement

(Announcement)

Xicheng Railway Passenger Line Shaanxi Co., Ltd. and Inner Mongolia High -speed Railway Co., Ltd. have commissioned China Railway First Survey and Design Institute Group Co., Ltd. The Ministry of Ecology and Environment No. 4) demanded that the project's information about the project is now disclosed to the public so that the public will put forward comments related to environmental impact assessment to the construction or evaluation unit during the preparation of the opinion draft of the environmental impact report.

1. Basic situation of construction projects

Project name: New Railway Yan'an to Yulin to Ordos Line

Construction unit: Xicheng Railway Passenger Line Shaanxi Co., Ltd., Inner Mongolia High -speed Railway Co., Ltd.

Summary: The new railway Yan'an to Yulin to Ordos is an important part of the Baohai Channel of the National "Eight vertical and Eight Heng" high -speed railway. Leading, Xiangbei passed through the Pagoda District of Yan'an City, Yanchuan County, Qingxuan County, Yulin City, Suide County, Mizhi County, Hengshan District, Yuyang District, and Shenmu City, Ikinhlo Banner in Ordos, introduced the end point Ordos stand. The length of the new front line is 389.84km. Among them, there are 79km in Yan'an City, 257.54km in Yulin City, and 53.3km in Ordos. There are nine stations including Yan'an (this line is not included, the construction of the West Yan high -speed rail), Yan'an New District, Yan'an New District, Yanchuan, Qingxuan North, Suidxi, Mizhi North, Yulinnan, Red Alkali, and Ordos. The railway level is high -speed railway with a design speed of 350km/h. The total investment of the project is about 63.8 billion yuan, and the construction period is 4.5 years.

2. The name and contact information of the construction unit

Unit name (in Shaanxi): Xicheng Railway Passenger Dedicated Line Shaanxi Co., Ltd.

Unit Address: No. 9, Jiangong Road, Xincheng District, Xi'an City, Shaanxi Province

Postcode: 710043

Contact: Party Minister

Contact number: 18710600303

Unit name (in Inner Mongolia): Inner Mongolia High -speed Railway Co., Ltd.

Unit Address: Inner Mongolia Autonomous Region Hohhot City Ruyi Industrial Park, Tengfei South Road No. 6 Director of Directors, No. 1, No. 11 Floor

Postcode: 010000

Contact: Cao Gong

Contact number: 0471-2244127

E-mail: [email protected]

3. The name and contact information of the environmental impact assessment agency

Evaluation unit: China Railway First Survey and Design Institute Group Co., Ltd.

Mailing address: No. 2, Xiying Road, Yanta District, Xi'an City, Shaanxi Province

Postcode: 710043

Contact: Zhou Gong

Contact number: 029-82365905

Fax: 029-82365880

E-mail: [email protected]

4. Public opinion table

See the attachment in the public opinion table.

5. How to submit public opinion forms and ways

After the information of the environmental impact report for this project is released, the public can submit it to the construction unit through e -mail, telephone, fax, letter, or interview, and put forward opinions and opinions related to the environmental impact evaluation of the construction project. Suggest.

appendix:

Construction project environmental impact evaluation public opinion form

August 1, 2022

- END -

Is it okay to drive a red light under the shadow?Practical sunscreen is here!

Breaking through the high temperature of 30 ° C, it is announced that the summer ...

The first meeting of Xinjiang -Pakistan Economic and Trade Cooperation Working Group was held

Tianshan News (Reporter Hei Hongwei) On the afternoon of July 18, the first meetin...