High -temperature guarantee power supply power worker "ice" transformer

Author:Cover news Time:2022.08.01

Luo Guoqiang Cover Journalist Huang Xiaoqing

At around 3 pm on August 1st, the highest temperature outside Dongxing District, Neijiang City, Sichuan exceeded 38 ° C. A power repair vehicle is equipped with more than ten ice cubes and shuttles on the streets and alleys. Soon after, these ice cubes appeared near several communities. It turned out that this was the National Grid Sichuan Electric Power (Neijiang) Communist Party member service team manually "heatstroke heat prevention" to high -temperature transformers, placed ice cubes to the safe position of transformers to ensure the reliability of the equipment and ensure the electricity consumption of residents.

"When the temperature is too high, we must add ice heat dissipation for transformers with high temperature in the city." In front of the No. 46 transformer No. 46, 10 KV Donghong Line, Dongxing District, Sun Zhichao, deputy captain of the State Grid Sichuan Electric Power (Neijiang) Communist Service Team, said. On the same day, they successively completed more than a dozen public changes including Taibai Road 10 KV Electric No. 1 Public Change, Fengwo Street 10 KV East Red Line, and No. 10 KV Power Power 1 Public Change of Telecom Community No. 4 Public Change 4 public changes. Calling work.

"Sometimes we have to knock the ice into a few pieces, and the ice cubes can be placed in the safe area under the transformer." The team member Wang Jun introduced the big ice cubes into two halves. Under the action of ice cubes, the transformer slowly "cools down" and runs normally, but the players holding the ice cubes did not "cool down". In high temperature weather, in order to implement the prevention and control requirements of the epidemic, they wearing masks and helmets must not only lift the ice cubes out of the car, but also perform a series of work such as ice cubes and transformers inspection. Under the upper flow, sweat also wet their work clothes.

On the same day, in order to complete the construction task of the power grid as soon as possible and improve the reliability of the power supply of the Neijiang Grid, He Chunlin, deputy general manager of the State Grid Neijiang Power Supply Company, led the power grid construction party members' assault team to actively fight the high temperature and keep the progress. The second -line N6 to N7 Tower is closed across the Chengdu -Chongqing highway. It is understood that there is a large number of leapfrog work in this line, and it needs to cross the Chengdu -Chongqing Expressway, the Inner Sui Expressway, the Chengdu -Chongqing Electricized Railway, and the Minjiang River.

Recently, in the face of continuous high temperature and hot weather, the State Grid Neijiang Power Supply Company went all out to the high temperature and power supply. The company's party members gave full play to the role of pioneer models, not afraid of hot heat, conducting inspections such as infrared temperature measurement of lines, and timely inspections Repair services. In July, the Neijiang Power Supply Company inspected a total of 13,632 Taiwan and 632 times, eliminated 176 defects, and dispatched 2,562 vehicles to repair vehicles.

- END -

Prose | Yang Qingzhen: Nanbaoshan handwriting

Text/Yang QingzhenWe rushed to Nan Baoshan in the heavy rain. The rain was too heavy, and I walked from the parking lot to the housing villa with an umbrella, and the dresses were almost soaked.Sittin

Qiangxian Fumin watched Lanling 丨 Pressing oil ditch rural complex: "Qilu model" that boosted the revitalization of the countryside

Video/Snapshot, T_100, F_JPG, M_fast Controls = Controls data-version/ueditor/video/mp4/20220629/165647047341535.mp4 transcoding = 1 style = width: 400px; Millennium ancient county, dru