up to date!The construction of the main road of Anqiu is ended, and it is about to open to traffic

Author:Anqiu Rong Media Time:2022.07.31

Leyuan Avenue Reconstruction Project is a key engineering project in our city. In order to ensure that this people's livelihood project is put into use as soon as possible and improves the travel environment of the residents, since the construction of the project, the Municipal Housing and Construction Bureau, the Municipal Municipal Engineering and Construction Development Service Center has actively coordinated the construction unit , Supervisor and other parties to participate in the construction of the main body of the construction, set up the Leyuan Avenue headquarters, conduct forward command, eat and live on the front line, find the problem on the front line, solve difficulties on the front line, overcome the impact of the epidemic and flood season, concentrate on strength, and concentrate on strength. The inverted construction period to ensure that the quality, progress, and safety are required to change every day and make progress in weekly. At present, the project has completed the layout of the main pavement asphalt and is undergoing the ending.

Leyuan Avenue is the main road of the east and west cities, with a total length of about 1470 meters and a road control line of 34 meters. Among them, the lanes are 22 meters wide, 2.5 meters of green belt on both sides, 2 meters of human sidewalks, and the width of 1.5 meters along the street is 1.5 meters wide 1.5 meters. Essence Create a new 3 -hole 10m reinforced concrete concrete simplified and hollow board Moxi Bridge. Rain and sewage pipelines in both sides. The bilateral symmetrical street lights are arranged, and the light source uses LED lamps.

After the project is opened to traffic, it will further unblock urban microcirculation, improve road traffic, improve the environment of the masses, provide strong security guarantees for the travel of the masses, and continuously improve the residents' happiness index.

Source: Anqiu Construction

Edit: Liu Xiaodong

Duty head teacher: Li Ping

Review: Wang Xiwen

- END -

There is nothing to say about the public examination application?Three demonstration methods are used to learn high scores!

Many students often have nothing to say when facing the composition of the applica...

Gathering humanity and improving emergency rescue capabilities, Wuhan Red Cross "rescue" is around

The Yangtze River Daily Da Wuhan Client July 2nd (Reporter Zhao Yan) Gathering hum...