Governing Huai adds "super engineering"!The largest water conservancy project in Jiangsu's single investment starts
Author:Intersection Time:2022.07.30
Concerning Point News On July 30, the Huaihe River entered the second phase of the sea water channel project. This is the largest water conservancy project in Jiangsu Province since the founding of New China. After the completion of the project, it will further expand the Huaihe River's floods, so that the flood prevention standards of Hongze Lake will be increased from 100 years to 300 years. At the same time, it plays an active role in stabilizing and effective investment, promoting economic growth, and ensuring that employment stabilizes.
The second phase of the Huaihe River entering the sea waterway
Jiangsu is in the lower reaches of the Huaihe River Basin, with sudden and extremely heavy rainstorms inside the area, and the problem of flooding. Thoroughly open up the Huaihe River into the seawater and crack the pain points of poor tails. Since the founding of the People's Republic of China, Jiangsu has invested more than 300 billion yuan to govern Huai, rectifying the water channel in the river, opening up the Yinhui waterway, and the first phase of the seawater channel project, forming a relatively complete flood prevention, moisture, waterlogging, staining, irrigation, irrigation, irrigation, irrigation, irrigation, irrigation, irrigation, irrigation, and irrigation. The water transfer engineering system has realized the flooding grooves, water supply and source of water supply, and drainage, which has changed the situation where the yellow disaster over the past hundreds of years has been changed.
Today, Hongze Lake and the downstream flood control standards have reached 100 years of encounter, but compared with the 300 -year standard requirements and high -quality development requirements determined by the national "Flood Control Standard", the safety of flood control and waterlogging and water prevention and waterlogging and water prevention is not high. Expand the discharge of the flood to ensure the safety of flood prevention in the basin.
The construction of the second phase of the waterway in the sea is of great significance. Yu Junjie, director of the Planning and Planning Division of the Jiangsu Provincial Department of Water Resources, introduced that the second phase of the project was based on the first phase of the project built in 2003. By 7000 cubic meters per second. After the implementation of the project, the flood roads in the lower reaches of the Huaihe River will be expanded to ensure the safety of more than 20 million people and more than 30 million mu of cultivated land.
The second phase of the Huai'an hub renderings
This month, the feasibility study report of the second phase of the Huaihe River was approved by the National Development and Reform Commission, and the total investment of the project was about 43.8 billion yuan. Behind the start of the start is the work and hard work of the whole province for more than 10 years-
The Provincial Government of the Jiangsu Provincial Party Committee attaches great importance to and actively promoted it. Many special research associations have been entered into the second phase of the seawater. The Provincial Department of Water Resources and Provincial Department of Natural Resources, the Provincial Ecological Environment Department, and the Department of Transportation actively promote the requirements of land use, environmental assessment, aviation evaluation and other elements. Huai'an and Yancheng actively coordinate relevant departments to work together to promote project approval projects.
According to estimates, every 100 billion yuan of major water conservancy projects can drive GDP to increase by 0.15 percentage points and add 490,000 new jobs. It is self -evident that the second phase of the waterway waterway project in stable and employment to promote employment is self -evident. "The second phase of the waterway in the sea waterway is in Jiangsu, and the benefits are in the entire basin. Jiangsu will adhere to the spirit of unity and water, adhere to the collaborative governance of the basin, and build the project into a safe waterway in the Huaihe River Basin, the ecological green channel of the JAC plains, the golden golden golden golden golden golden lane, and the golden golden golden golden. Channel. "Chen Jie, the Provincial Department of Water Conservancy, said that after the implementation of the project, the river channels are wide, the water depth conditions are excellent, and the depths are appropriate. The reconstruction and expansion of the hubs and cross -river bridges can meet the requirements of the level II channel. Increasing transportation capacity has created conditions, which is of great significance to promote the economic and social development along the Huaihe River Basin.
Xinhua Daily · Jiaojiao Reporter Wu Qionghong Ye
Photo Conferry of the Jiangsu Water Resources Department
- END -
The self -correction work in the field of hydropower heating illegal charges has begun!Clean up standards for unreasonable charges and unreasonable price increases
In order to implement the decision -making and deployment of the State Council and...
Emergency reminders in Guangdong: Shenzhen comes back to personnel to report immediately!
Shenzhen found 2 asymptoms in community screeningThe trajectory involves Futian Di...