Wuhan Traffic Police reminds: Please bypass these roads!
Author:Yangtze Cloud Time:2022.07.30
Recently, some roads in Wuhan will be renovated and constructed. The way of passing has changed, and the national accounting professional and technical qualification examination will also be held. Here, Wuhan Traffic Police issued a travel reminder to ask citizens to pay attention to bypassing.
01
From August 3, 2022 to September 30, 2022, the parrot trail of Hanyang District will carry out road renovation project construction. The announcement of road traffic management during the construction period of this section is as follows:
I. Parrot trail (waist embankment road to Jinxiu 3rd Road) implements a motor vehicle from north to south (waist embankment road to Jinxiu Three Road).
2. Motor vehicles that need to pass the construction section can bypass the surrounding roads such as parrot avenue and Yangxin Road.
02
From August 2nd to December 2, 2022, the construction of the heating pipeline project will be carried out in Qingshan District Travel Street, Industrial Second Road, and Ezhou Street. The announcement of road traffic management during construction is as follows:
One, August 222 to September 30, 2022, the travel street (construction one to the construction of the second road) implemented a motor vehicle from west to east (construction one by one to build two roads). The motor vehicle is one -way from north to south (municipal side street to metallurgical first street).
2. From August 2nd to December 2, 2022, Ezhou Street (Industrial One Road to Industrial Fourth Road) implemented a motor vehicle from west to east (Industrial One Road to Industrial Fourth Road).
3. Motor vehicles that need to pass the construction section can bypass the surrounding roads such as metallurgical avenue, Jingzhou Street, Suizhou Street, Fushun Street, Heping Avenue, Industrial Road, Industrial One Road, and along Hong Kong Road.
4. The adjustment of the bus operation route and stopping site, in accordance with the "Regulations on the Management of Urban Public Passenger Transport and Transportation of Urban Public Transport in Wuhan".
03
The National Accounting Professional and Technical Qualification Examination of Wuhan Examination District in 2022 will be held in Wuhan in August and September. Among them, the primary exams were held from August 1st to 3rd, the advanced examination was held from August 7, and the intermediate examination was held from September 3rd to 5th (if there was a change, notified separately).
A total of more than 90,000 people reference in this examination, the number of junior and senior examination references is about 52,000, and 38,000 intermediate examinations. It mainly involves 6 jurisdictions including Hanyang, Wuchang, Hongshan, Development Zone, Dongxin, Jiangxia, and a total of 12 test sites.
2022 National Accounting Professional Technology
Junior, middle, and advanced qualifications without paper test
(Wuhan Exam Area) Testing points arranged clear tables
Serial number
Jurisdiction
Test name name
address
Exam arrangement time
primary
advanced
intermediate
1
Hongshan District
Wuhan Business School
No. 3 Huangjiahu West Road, Hongshan District
8: 30-17: 30 from August 1st to 2nd
September 3rd to 5th 8: 30-20: 00
2
Wuhan Traffic Vocational College
No. 6 Huangjiahu West Road, Hongshan District
8: 30-17: 30 from August 1st to 2nd
September 3rd to 5th 8: 30-20: 00
3
Wuhan Shouyi College
No. 22 Nanli Road, Hongshan District
8: 30-17: 30 from August 1st to 2nd
September 3rd to 5th 8: 30-20: 00
4
Hubei University of Technology
No. 28 Nanli Road, Hongshan District
8: 30-17: 30 from August 1st to 2nd
August 7th
8: 30-12: 00
September 3rd to 5th 8: 30-20: 00
5
Wuhan Electric Power Vocational and Technical College
No. 189, Luoyu Road, Hongshan District
8: 30-17: 30 from August 1st to 2nd
September 3rd to 5th 8: 30-20: 00
6
Hanyang District
Wuhan Finance School
No. 790 Hanyang Avenue, Hanyang District
8: 30-17: 30 from August 1st to 2nd
September 3rd to 5th 8: 30-20: 00
7
Wuchang District
Wuhan Aochu Examination Center
Building No. 2, Building 2, Wuhan Headquarters, No. 17, Green Slim Health Industrial Park, Baihazhou Avenue, Baihazhou Avenue, Wuchang District
8: 30-17: 30 from August 1st to 2nd
September 3rd to 5th 8: 30-20: 00
8
Wuhan Donghu New Technology Development Zone
Wuhan Huaxia Institute of Technology
Wuhan Donghu New Technology Development Zone Guanshan Avenue No. 589
8: 30-17: 30 from August 1st to 2nd
8: 30-11: 30 on August 3
September 3rd to 5th 8: 30-20: 00
9
Wuhan Business Vocational College
Wuhan Donghu New Technology Development Zone Guanggu 225
8: 30-17: 30 from August 1st to 2nd
September 3rd to 5th 8: 30-20: 00
10
Jiangxia District
Wuhan Guanggu Vocational College
No. 6, Limiao Road, Jiangxia District
8: 30-17: 30 from August 1st to 2nd
September 3rd to 5th 8: 30-20: 00
11
Wuhan Textile University
No. 1 Sunshine Avenue, Jiangxia District
September 3rd to 5th 8: 30-20: 00
12
Wuhan Economic and Technological Development Zone
Jianghan University
Wuhan Economic and Technological Development Zone Triangle Lake Road No. 8
September 3rd to 5th 8: 30-20: 00
"Return to Hubei · Travel"
Hubei Travel Service Platform
How to use "Return to Ebao"
Click the card below
Follow the official WeChat of "Changjiang Cloud"
-NickName = "Yangtze River Cloud" data-alias = "Changjiang-Y" Data-Signature = "Yangtze River Cloud-Recording a drop of water" data-from = "2" has-insert-poloading = "1" WAH-Hotarea = "CLick" /> Click the menu bar "Return to Ebao"
Enter the service platform
Departure, destination risk, travel policy
Query
- END -
Haidian Fire Detachment and Xiangshan Park carry out ropeway rescue drills
In order to vigorously promote the construction of emergency rescue professional teams, focus on improving the ability to deal with high -altitude mountains accidents, and ensure that high -altitude a
worry!The residents of a community in Jinan live on the 4th floor of the water flowing small water can only be "wrong".
Qilu.com · Lightning News July 17th. Many families buy a house, and they will co...