Shijiazhuang City will repair these sections next week. Please pay attention to safety when traveling

Author:Hebei Radio and Television Sta Time:2022.07.29

Shijiazhuang Daoqiao Facilities Management and Protection Center will repair road and bridge facilities such as Jianhua Street, Tanu Street, Huai'an Road Viagra, and other roads and bridges next week (7.30-8.5). The road operation takes local closed measures, the bridge operation is fully closed by the viaduct, and the auxiliary roads are used normally. The stool maintenance was under construction during the day, and other maintenance was carried out at 22 to 5 am the next day at night. In the case of emergency tasks, atmospheric warnings and rainy weather, the construction plan may be adjusted appropriately to remind passengers and pedestrians to pay attention to traffic safety. The specific maintenance sections are as follows:

1. Jianhua Street (South Second Ring-Shiluan Road) Expressway repair

2. Talking about Gu Da Street (Yuhua Road-Huai'an Road) Expressway maintenance

3. Zhongshan Road (Southwest corner of Sports Avenue)

4. Guang'an Street (Zhongshan Road-Heping Road) to repair

5. Alliance Road (Gaodong Street-Gaozhong Street) Poor Road Maintenance

6. Jianhua Avenue (Harvest Road-North Second Ring Road, Donggang Road-Tasan Road)

7. Sports Avenue (South Second Ring Road-Huai'an Road) seal cracks

8. Huai'an Road viaduct replace the sound barrier screen

9. Heping Road, Huai'an Road, and Yenzuki screens and collision blocks along China Avenue

(Du Yanqing Wang Yan, Hebei, Zhao Yue, a correspondent)

- END -

Du Yujie led Binzhou delegation to participate in the 14th Congress of the Shandong Provincial Federation of Industry and Commerce

On June 22, the 14th Congress of the Shandong Provincial Federation of Industry an...

The "Xianyang Good People List" in the second quarter of 2022 was announced

After comprehensive review by the masses, the selection of grassroots, and the rev...