Painting Civilization Haidian | These annoyance things will be resolved!The reconstruction of the southern district of Yuxin Garden Community "Huanxin"
Author:Beijing Haidian Time:2022.07.28
Old Community Reconstruction
It is to promote the organic update of the city
Improve the living conditions of the masses
An important livelihood project
Sanqi Street Yuxin Garden Community South District
This year will be transformed
"Change the new face"
On July 26, a full -loaded red truck entered the South District of Yuxin Garden Community in Xisanqi Street.
The southern district of Yuxin Garden Community was built in 1998. Over time, problems such as aging of buildings and outdated public facilities in the community were the most serious thermal insulation. Ms. An, who lives in Building 67, told reporters: "When the building was built, considering innovation, the insulation material was added on the exterior wall of the building. 6 high -rise buildings and 3 multi -storey insulation layers were considered to be considered as 'Highlights', but the material is thin, and it cannot keep the insulation in the winter. "
Wang Dongxin, Secretary of the Party Committee of Yuxin Garden Community in Xisanqi Street, said: "In order to ensure the indoor temperature of the nine residential buildings in the southern district, in the winter heating season, the community boiler room 4 groups of boilers are fully heated. When there is sunlight during the day, it is 14 to 17 degrees Celsius. If you catch up with the cooling, the indoor temperature will be 13 degrees Celsius. "
"Our buildings are at the wind at the wind. In the winter, the wind in the northwest is scraped. Layer thick clothes or down jackets. "
Under the promotion of Xisanqi Street
The southern district of Yuxin Garden Community is incorporated into the old community renovation project
This transformation involves
1342 households in 9 buildings
The transformation area is 144,000 square meters
"Affected by the epidemic, the construction period is delayed for a while. It is expected that the exterior wall thermal insulation can be completed in November this year. After the transformation is completed, the body insulation effect of the building will meet the energy saving and insulation standards. The transformation of the upper and lower water, the stairwell, and the barrier -free facilities will also be transformed together. "Wang Dongxin introduced that outdoor greening and road renovation will also be the focus of this transformation, which truly cracks the people's troubles.
After transformation
Effect of the building exterior wall
Pace effect
Effective facilities effect
Reporter | Wu Xuanxuan
Edit | Liu Ying
Review | Sun Ruixia Wei Ying
- END -
Just now, he was sworn in president
On the morning of the 21st local time, Vikra Marinha sworn in the President of Sri...
[Psychological Health] The most harmful emotions for the human body are not angry and sad
In all emotions,The lowest line is not anger, sadness, and fear;The highest rankin...