Shandong issued important notice

Author:Yun Shang Longkou Information Time:2022.07.27

At present, Shandong has entered a critical period of flood prevention in the "seven or eight". Extreme weather events are prone to occur, and the situation of flood prevention and typhoon is complicated and severe. Recently, flood disasters have occurred in many places across the country, causing serious casualties and injuries. announcement of. The notice pointed out that since the flood in, many parts of Shandong have repeatedly rainfall the rainfall process. The soil saturation is high, the current flow of flow is fast, the water conservancy projects in the province are generally more water storage, and the risk hidden dangers are overlay and the flood prevention situation is complicated and severe.

Strengthen the management of high water conservancy project operation. At present, the province's large and medium -sized reservoirs and South Four Lakes and Dongping Lake water storage capacity is 7.848 billion cubic meters, which is more than 4.215 billion cubic meters more than the same period of the same year. test. Relevant departments at all levels must improve their vigilance, effectively strengthen the management of project safety operations, pay close attention to weather changes, do a good job of analysis of the rainfall capacity of large and medium -sized reservoirs in advance, scientifically arrange pre -leakage libraries, and leave full flood control library. It is necessary to coordinate the project upstream, left and right, and upstream floods must be notified in advance the relevant departments of the downstream in advance to resolutely avoid casualties and property losses due to improper operation. We must continue to do daily inspections of the project, strengthen the duty on duty and information reporting, and add inspection forces during heavy rainfall and flooding period, encrypt the number of inspections, discover the problems as soon as possible, and submit the relevant situation in a timely manner to ensure the safety of the project safety and floods. Essence

Accelerate the repair of water destruction engineering facilities. In the early stage, continuous heavy rainfall caused some regional engineering facilities to destroy, and some flood control projects and infrastructure water destroyed, which directly affected the role of flood control engineering. Relevant departments at all levels should attach great importance to focusing on water conservancy, transportation, electricity, communication and other industries, and comprehensively investigate and verify the water destroying and facilities of the reservoir, Tangba, Kenheqiao, road bridge, power supply facilities, communication equipment and other engineering facilities. Damage, establish accounts, implement responsibilities, and closed loop management. To seize the opportunity, organize the force to deal with key equipment such as dikes, slope protection, dam, spillway, gates, and flood control roads, and maintain key equipment such as flood discharge facilities, opening machinery and backup power supply to restore the engineering flood prevention in time Function. It is necessary to coordinate the dredging and maintenance of drainage pipeline networks, dark canal, rainwater, and drainage pumping stations, and pay close attention to the maintenance and maintenance of important infrastructure such as transportation, power, and communication, and make every effort to ensure the safety of urban flood prevention during the flood season. Be prepared for the heavy rainfall process.

Strengthen monitoring and forecast early warning. It is necessary to pay close attention to weather changes and rainwater flood flood conditions, strengthen monitoring forces, improve monitoring methods, roll analysis and reports, strive to extend the foreseeable period, and improve the accuracy of forecasting. It is necessary to further improve the measurement method and strengthen the quality of the test report, and effectively improve the prediction and forecasting level of local heavy rainfall, typhoon, rhodontics, landslides, mudslides, and mudslides. The anti -finger of the finger at all levels must grasp the rain, water, flood, and dangerous situation in real time, further strengthen the research and judgment of the federations, establish a rolling meeting business mechanism, accurately analyze and judge the development trend of the dangerous situation of rain and water conditions, and to prevent flood prevention, engineering scheduling, flood rescue, etc. Provide strong support. It is necessary to strengthen the release of early warning information, implement various types of early warning release channels, and release early warning information in advance to achieve full coverage and no dead ends.

Strictly prevent urban waterlogging disasters. It is necessary to further strengthen the bottom -line thinking and extreme thinking, and effectively implement the work measures of urban flood prevention. It is necessary to strengthen the operation and management of flooding facilities, timely organize the dredging urban river channels and drainage pipe networks, and keep an eye on key parts such as crossing bridges, tunnels, culverts, underground spaces, construction sites, low -lying waterlogging areas, dangerous houses, etc. Destroy water, implement emergency control measures, and prepare for emergency situations such as "stop work, suspension, suspension, and shutdown" to ensure the safety of urban operation.

Pay attention to the defense of mountain floods and geological disasters. It is necessary to effectively strengthen the defense of mountain floods and geological disasters, do a good job of monitoring and prediction, strengthen the department's federations and analysis and judgment, timely release early warning information, start response, and provide strong support for the decision -making decision -making, transfer of risk shelter, and engineering dispatch for the defense command of the flood and geological disaster. Essence It is necessary to make full use of the flood disaster monitoring and early warning system and the group testing system, and keep an eye on the water -resistant bridge, drilling section, river risk point, hidden dangers of disaster, slope cutting point, mountain flood ditch, hills, and rivers In dangerous areas such as edge and cliffs, strengthen inspections before rain, inspections, and review after the rain, to ensure the discovery of problems, deal with the first time, and report as soon as possible. Essence

Ensure the safety of the project under construction. It is necessary to highlight the safety management of the construction of the project in the construction of the project, comprehensively understand the project under construction, especially the construction projects in the construction of the area under construction, especially the construction projects in the construction of the construction units and construction supervision units in an all -round way. It is necessary to compact the safety responsibility of construction in construction, strengthen the primary responsibility of the safety of the legal person in construction projects, and decompose the responsibility of safety and flooding work to various participating units to ensure the implementation of the responsibility of safety and flooding. , Each position and participating personnel. The anti -finger and meteorological and water conservancy departments at all levels shall promptly issue early warning information to notify the person responsible for engineering forecasting, water conditions and engineering flood discharge. Relevant responsible persons in construction projects must organize personnel and construction equipment to evacuate in the first time, detailed preventive measures, and timely implement the early warning department to ensure the safety of personnel and equipment. Make every effort to transfer the risk -free work. It is necessary to ensure the safety of the people's lives in the first place, and make every effort to do a good job of typhoon and the personnel transferring the hedging work during the rain. Aiming at the flood disasters, hidden dangers of geological disasters, diseased reservoirs, top databases, tailings, simple board houses, tourist attractions, urban and rural dangerous houses, school kindergartens, nursing homes and other areas, further refine the transfer of actualized personnel. Implement the transfer route, placement location, responsible person, contact person, transfer transportation, etc. It is necessary to quickly and decisively transfer the crowds in dangerous areas, so as not to miss one household or one person, and strictly prevent casualties caused by incomparable personnel due to inadequate transfer and incompleteness. It is necessary to do a good job of resettlement of transfer personnel, equip full -time managers and professional medical staff, properly solve the difficulties of living and resettlement masses, and ensure that the masses have food, clothing, house living, drinking water, drinking, and sickness. Getting timely treatment, strictly prevent the transfer of transfer personnel before the danger was lifted, causing secondary disasters.

Source: Shandong Emergency Management

Edit: Dahao

- END -

Approach Xu Yu, the shortlisted by "the most beautiful Shaanxi Cultural Relics Safety Guardian"

Today we approach Xu Yu, the shortlisted by the Most Beautiful Shaanxi Cultural Re...

One year after graduation, their story is also wonderful!

On July 7, 2021, the Education Online Weekly of the CPPCC released the article Go ...