223 million kilowatts!Southern Power Grid unified load this year the first historical high
Author:Golden sheep net Time:2022.07.26
The staff of the Dongguan Power Supply Bureau Transportation Management Institute of the Power Management Institute, "Step in the air" at a height of 100 meters, carefully check the line Yan Xiaolong Song Rui Photo
The reporter from Yangcheng Evening News learned from the Southern Power Grid that at 15:23 on July 25, the Southern Power Grid's unified load reached 223 million kilowatts, an increase of 6.459 million kilowatts from the highest load last year, an increase of 2.99%. This year, the first historical high.
Recently, high temperature weather in the south has continued."In Guangdong, when the temperature reaches above 35 ° C, the corresponding load will increase by 3 million to 5 million kilowatts every time Celsius is increased." According to Yang Lin, manager of the dispatching department of the Southern Power Grid Electricity Scheduling Control Center.
(Cheng Xinghuan Huang Yonghua Yuan Quan)
- END -