Luoyang issued a notice requesting to actively respond to the heavy rainfall of this round
Author:Luoyang Daily Time:2022.07.26
According to the latest meteorological data analysis, from 25th to 28th, due to the eastward shift of short -wave trough in the middle latitude area, Luoyang has a short shower and thunderstorm weather. Among them, from the afternoon of the 25th to the night, there are decentralized showers and thunderstorms in the city. The rainfall distribution is unevenly distributed. There are heavy rain and local heavy rain along the yellow area in the north and the southern mountainous areas. , Local 60-80 mm, with short -term heavy precipitation and thunderstorms during thunderstorms, such as short -term precipitation, thunderbolt wind, etc., the maximum hourly precipitation is 30 to 50 mm. From the 27th to 28th, the city has decentralized showers and thunderstorms.
From 12:00 on the 25th to 20:00, Luoyang has appeared unevenly distributed thunderstorm weather. Rvernight occurred in Lunning, Songxian, Yichuan, Yiyang, Ruyang and other situations. 16-17 on the 25th). At the bottom of the Luoning River, the Eastern Song Dynasty, and the small world, hail appeared in the gate of Songxian County, with a maximum hail diameter of 4-6 cm.
Based on this situation, on the evening of the 25th, the Office of the Flood Control and Drought Resistance Headquarters in Luoyang issued the "Notice on Doing a Good Rain Rainst Rainstorming Work", requiring localities to actively do a good job of responding to the heavy rainfall weather in this round of heavy rainfall.
The "Notice" pointed out that it is necessary to strictly implement the flood control responsibility system with the responsibility system of the executive head, and the flood control project flood control administration, technology, inspection of the "three responsible persons" and the responsible person of the competent authority should ensure that the communication is unobstructed, and the silt dam and the reservoir and the reservoir shall , Tangba, Tail Mining, and Geological Disaster Points and other key parts are checked and checked. We must adhere to the 24 -hour leadership and duty system, and closely monitor the development and changes of weather and rainwater flood conditions. It is necessary to strengthen the random inspection of the flood control duty to ensure that the personnel on duty are on duty, and the responsible person is in office. It is necessary to organize the discussions and judges in time, pay close attention to the short -term warnings issued by the meteorological department, keep an eye on the heavy rain settlement area, and accurately dispatch points in real time. It is necessary to highlight the focus of prevention, strengthen inspection and defense of key parts such as floods and geological disasters, small reservoirs, silt dams, and tailings. It is necessary to focus on the urban waterlogging that may be caused by the short -term intended and heavy precipitation, strengthen the control of low -lying waterlogging points, dangerous houses, and underground spaces, and avoid accidents such as drowning, collapse, electric shock. It is necessary to prepare for emergency response, preset the rescue rescue team and materials, and once the dangerous situation occurs, immediately organize rescue and rescue to ensure the safety of the people's lives and property. It is necessary to report information such as rain, water, flood conditions and other information in a timely manner. (Luo Bao Mercy Reporter Lu Baiying)
Source: Source Network
- END -
Position and separation error frequency of nuclear chromosomes
Article | NovemberAneuploidy refers to the state where the number of cell genome c...
The opening of the 28th China Lanzhou Investment and Trade Fair, Linxiazhou Huaer Linxia • In the Heizhi Prefecture "Theme Exhibition Hall officially opened
On the morning of July 7, the opening ceremony of the 28th China Lanzhou Investmen...