Xinjiang Beihuang Highway Engineering Project Blows the Drigan Quick Up charge number

Author:Altay Daily Time:2022.06.15

■ The starting point of the project is located on the east side of the G3014 Beitun South, and the starting point of the proposed S18 (Beitun -Burzin high -speed)

■ After the project is completed, a north -south channel will be formed in the region to achieve the "connected connection" of the regional trunk road

In order to seize the golden season of summer construction, the Tenth Division Beitun City -182 Regiment of Huanghuagou Section of the Cito -Huanghuagou Section of the CICC (hereinafter referred to as Beihuang Highway Engineering Project), which was built by the Fourth Division of the China Railway A busy scene at the scene.

On June 12, the construction site of the Beihuang Highway Engineering Project was loud, and more than 300 machinery such as road press, flat machinery, bulldozers, excavators, and dump trucks went into battle. At present, the construction of road bases, culverts, and pile foundations has been promoted in an orderly manner. Multi -working, multi -regional cross -operation, simultaneous construction ... A roadbed that has begun to take shape extends to the distance.

The starting point of the Beihuang Highway Engineering Project is located on the east side of the G3014 (Kua Highway) Beitun South. It is connected to the starting point of the S18 (Beitun -Burjin Expressway). After the Fengqing Airport, after the east of the Fengqing Lake Reservoir and the west of the Fuhai Reservoir, set up an interoperability and Yuyue Lake service area in the 182th regiment. After the Water Conservancy Project, the Xiangqu can set up a hub to connect with the S21 (Altay to Urumqi Highway). Then the route stopped near Huanghuaou and connected to the tenth division Huanghuigou -184 regiment road.

It is understood that the lines of this bidding section are 52 kilometers in length. The main construction contents include road bases, roads, bridges, road cross, traffic safety facilities, management and maintenance and service houses, greening, monitoring charging communication, etc. Facing the actual situation of tight construction period and heavy tasks, the project department combines node targets and the golden period of construction, and plans before. In reality, reorganization, seeking practical results, actively implementing "epidemic prevention+production", always maintaining the motivation of "starting is to work hard, starting is a decisive battle", and promote the construction of engineering projects with full enthusiasm.

As of now, the Beihuang Highway Engineering Project has completed the road base of 316,000 cubic meters, the road base is 509,800 cubic meters, the roadbed excavation is 234,600 cubic meters, the culvert 472.49 rice, and the bridge pile foundation. The task laid a solid foundation.

Beihuang Highway Engineering Project, as one of the "five channels" of the "five channels", after the project is completed, a north -south channel will be formed in the region to realize the regional trunk road "connected" to improve the regional road network layout and give full play to the full play. The overall benefits of the road network have become the main channel for the south of Beitun City to achieve the high gathering of people flow, logistics, capital flow, and information flow, which is conducive to the development of integration economy and expanding opening to the outside world.

Correspondent Jia Mingming

- END -

This group of people is amazing!108 kilometers of the Gobi Desert, just for ...

After the epidemic, how can companies go with partners again? From June 8th to Jun...

[Learn and implement the spirit of the Provincial Party Congress] Jiuquan Subei: Multiple measures to carry out propaganda activities for rehabilitation and people's livelihood projects

In order to thoroughly study and propagate the spirit of the 14th Provincial Party Congress, and further improve the awareness rate of the masses' policy of rehabilitation and people's livelihood, and...