National Highway G209 renovation project project
Author:Luliang Daily Time:2022.07.23
After the construction of the builders of Luliang National Highway Company of Shanxi Road and Bridge Group in the past three years, the Yangzhuling Tunnel, one of the control projects of the National Highway G209 renovation project, successfully penetrated on July 18thThe whole line is connected.
The total mileage of the National Highway G209 renovation project was 74.65 kilometers. The project was opened in 2019 with a total investment of 7.184 billion yuan.The 3.1 -kilometer Yangzhuling Tunnel is located in Fangshan County. It is the longest and most technical difficulty of the National Highway G209 Luliang Reconstruction Project.The builders of the Luliang National Highway Company of Shanxi Road and Bridge exceeded the problem of bad geological conditions such as large water content, surface cracks on the surface, cave top droplets, and palm -sidelines.The left cave penetrated on the 18th.Fangshan to Li Shizhi is expected to be opened to traffic during the National Day and operation during the year.Reporter Liu Liangliang Photo
- END -
There are air conditioners, WIFI, watermelon, and the correct way to open the "Workers' Station" in summer
The workers were resting in the station. Reporter Zou WeifengReinforcement work cl...
On the first day of the Oregon World Championships: Sister Cheyang Shi picked Tongsu Suitian and Gong Lizhen advanced [icon]
Xinhua News Agency, USA, July 15th. 2022 The Oregon World Athletics Championships ...