Carry out the "disciplinary inspection+professional" supervision to help the "Bidding Network Project" quickly advance

Author:Jiuquan Daily Time:2022.07.22

Recently, in order to accelerate the implementation of the construction of the agricultural network project, the Guozhou Power Supply Company of the State Grid has implemented the "disciplinary inspection+professional" supervision model, set up a special inspection team of the agricultural network project, and incorporates 42 unfinished single engineering projects into supervision Cage, implement the entire process of follow -up supervision, urge the promotion of the construction of the agricultural network project to be implemented smoothly as planned, and continuously improve the level of management management of the agricultural network.

The company led by the Discipline Inspection Commission, jointly developed the Ministry of Construction, the Ministry of Production Technology, and the Marketing Department, etc., in -depth construction and acceptance site, and carried out supervision and inspection by "listening to reports, checking information, and watching the scene". The management requirements of the end, conduct a comprehensive and detailed inspection of each station area, line, tower equipment and household table reconstruction in engineering operations. At the same time , Check whether the waste materials are recovered in full amount, and verify the hidden safety hazards, quality defects, quantity of materials, and engineering settlement in the project. Engineering quality meets the acceptance requirements.

In response to the problems discovered, the company's disciplinary committee established the "ledger sales number" management through interview reminders and other methods to urge the responsible departments to dig deep into the workflow and on -site construction. Highlight the governance of the current surface problems, and dig deep into the root cause of the problem, which improves the effectiveness of daily supervision discovery, warning reminders, and promoting rectification.

As of now, the company's 42 single projects have been completed, and 25 items have been completed, and parts of 17 single projects, Taiwan areas and other projects have been completed. In the next step, the company will increase supervision, carry out "disciplinary inspection+professional" supervision, improve supervision and discipline effects, continuously explore new ideas of supervision work, coordinate and promote the implementation of agricultural distribution network projects, and help the "Equipment Network Project" project accelerate the acceleration implement. (Wang Fan)

Editor in charge: Tian Xue

- END -

Jiangxi Meteorological Observatory lifted lightning yellow warning [III level/heavier]

Jiangxi Meteorological Observatory, June 10, 2022 at 02:20, lift lightning yellow warning signals

Xiangcheng District reports 3 typical cases of drunk driving in party members and cadres

1. The abnormal party member of Huagang Village, Whalong Town, Xiangcheng District, was drunk drunk driving. On the afternoon of March 3, 2021, when You Meng drunk, he drove a motor vehicle and drove