Complete opening to traffic!
Author:Hebei Daily Time:2022.07.22
1. Jiefang Street from north to south cannot turn right to the South Second Ring Road Bridge for the time being
Second, the main route of the South Second Ring Road from the east to the west of Hongqi Street and Vamin Street, the vehicles can leave the main road normally.
Third, the main route of the South Second Ring Road from the east to the west of Shitong Road is under construction. There are enclosures, and the vehicles cannot leave the main road through this.
Fourth, the main route of the South Second Ring Road from the east to the west, the vehicle can normally transfer to the ramp of Yuquan Road and Jingyu.
5. The exit of the Western Second Ring Road from the south to north to the north is already available with a water horse.
Sixth, the main route of the West Second Ring Road from the south to the north of Huai'an Road, the exit of Huai'an Road has been blocked with water horses, and the vehicles cannot leave the main road through this.
7. The main route of the West Second Ring Road is exit from the south to the north to the north. The vehicles can leave the main road through this.
8. The main road of the West Second Ring Road is from the north to the south of Huai'an Road. The vehicles can enter the main road and drive forward. The exit of Yuxin Road has been closed by cone barrels and water horses. The vehicles cannot leave the main road through this.
Nine, the southwest two rings are interconnected, and the vehicle can be transferred from the main road to Yuquan Road and Jingyu.
Ten, the South Second Ring Road from the west to east. Although the direction of the stone and copper road cannot be driven on the sign, the connection bridge between the South Second Ring Road and the South Third Ring Road in the provincial capital has been completed and opened to traffic. Leave the main road of the South Second Ring Road.
The eleventh and the South Second Ring Road came from the west to east of Hongqi Street. There were water horses closed, and vehicles could not leave the main road.
The twelfth and the South Second Ring Road exit from the west to east of China, and the vehicles can leave the main road through this exit.
Reminder: At present, some of the auxiliary road sections of the South Second Ring and West Second Ring Road, which are just completed in Shijiazhuang, are under construction. The staff said that according to the plan, the construction is expected to end in September this year.
A little more news
- END -
8 departments including the Department of Retired Military Affairs jointly issued the "Opinions on Promoting the Reform and Development of Outstanding Hospital"
Xinhua News Agency, Beijing, June 29. The Ministry of Retirement Department, the Ministry of Finance, the National Development and Reform Commission, the Ministry of Human Resources and Social Securit
In 2022, the National Green Building Materials Going to the countryside (Shandong Station) launched in Tengzhou City
On July 7th, the launching ceremony of the 2022 National Green Building Materials ...