When will the three major under the Jinzhai Road be completed?The latest "progress bar" is here

Author:Hefei Daily Time:2022.07.22

Yesterday, the Municipal Key Bureau announced that

July 25th at 22:00,

Citizens will usher in Jinzhai Road (Longchuan Road-Fangxing Avenue)

The main line of engineering bridge is open to traffic,

The more smooth Hefei Road network is just around the corner.

Then this time Jinzhai Road Fast Transformation Project

What is the construction of key nodes in each bidding segment?

Today, the reporter sorted out another "progress bar",

Take you in detail!

Specifically:

One -standard section

Jinzhai Road (Longchuan Road-Shimen Road)

At present, the main line elevated has been completed, and the ground fast lane under the bridge is normal (of which the ground expressway under the bridge from Cuiwei Road to the bustling avenue section is due to the influence of the bustling avenue, maintaining both sides). It is expected to be completed before New Year's Day next year.

Two -standard section

Jinzhai Road (Shimen Road-Zipeng Road)

At present, the main line elevated has been completed, and the ground expressway under the bridge is normal (where the ground fast lane under the bridge from Zhaoshan Road to the Zipeng Road section is affected by the intersection of the integration of the Fairview Avenue) It is expected to be completed before New Year's Day next year.

Three -standard section

Jinzhai Road (Zi Peng Road-Fangxing Avenue)

At present, the main line is completed, and the ground expressway under the bridge is normal. The remaining ramps, ground auxiliary roads, sidewalks and soup roads are expected to be completed before New Year's Day next year.

Four -standard section

Jinzhai Road (Fangxing Avenue-Wangshui Road)

At present, the main structure of the main bridge has been completed, and all the project volume is expected to be completed before New Year's Day next year. Affected by the construction of the Jiangzhai Road Bridge of Jiangji Huaihuai, the release time of the main bridge is to be set, and the roads under the bridge remain normal.

Finally, summarize in one sentence:

Jinzhai Road (Around the Town Highway-Fangxing Avenue)

The greatest significance of the construction of rapid transformation project,

It is conducive to improving the road skeleton system of Hefei City,

Further improve the transportation environment.


Text | All Media Reporter Wang Junchao

Edit | All media editor Wu Qingpei

Produced | "Lakeside Point" Rong Media Studio, "Shanshan is not late" Rong Media Studio

- END -

In the summer vacation, there is a group of big friends who care for children in Liangshan

Cover Journalist Xi QinlingThe summer vacation arrived. On July 13, a group of big...

Tomorrow, some sections of Huangshi Park Road will be closed!

Huangshigang District Urban Management Law Enforcement Bureau issued an important notice. The Huangshigang District Urban Management Bureau plans to trim and plastic surgery on both sides of the park