Those sections of Jieyang implement traffic control

Author:Ping An Jieyang Time:2022.07.21

About the bridgehead of the eastern section of Xinbei Bridge in Rongcheng District

During the construction period of the road surface renovation project on both sides

Illustration of traffic control notice

not

The Urban Management and Comprehensive Law Enforcement Bureau (owner) of Rongcheng District of Jieyang City entrusts Jieyang Jian'an Construction Engineering Co., Ltd. (construction unit) to be undertaken by the road surface renovation project on both sides of the bridgehead of the bridgehead of the east section of the Xinbei Bridge of the new city district will be under the recent construction to ensure the project to ensure the project The progress of progress is smooth and the road traffic safety is orderly. The traffic police detachment of the Jieyang Public Security Bureau decided to implement traffic control during the construction period of the road in accordance with Article 39 of the Road Traffic Safety Law of the People's Republic of China. Intersection

not

1. The scope and method of traffic control

Auxiliary Road, north and south of the east of the Xinbei Bridge of Rongcheng District. The construction of the auxiliary roads on both sides of the north and south in staging, the two -way main lanes are normal.

not

2. Traffic control time

From July 25, 2022 to September 10, 2022.

not

Third, precautions

During the traffic control period, the passengers and pedestrians are requested to pass through in accordance with the provisions of this notice and the road signs to obey the traffic police and on -site safety personnel instructions.

not

announce

not

Jieyang Public Security Bureau Traffic Police Detachment

July 19, 2022

About the dredging of Che Tianhe, Jiedong District

Ecological restoration and improvement of transformation engineering road

Announcement of implementing traffic control

not

Due to the needs of the construction and construction construction of the East District Cheta River and the improvement of ecological restoration and upgrading projects. In order to ensure the smooth and orderly construction of the project and road traffic, the Jieyang Public Security Bureau Jiedong Branch Traffic Police Brigade Article 19 stipulates that traffic control is implemented during the construction period of the relevant road section. The relevant matters are announced as follows:

not

1. The scope of traffic control

The section of Daibai Village, 114 County Road, Putian Town, Jiedong District (Putian Hospital to Little Apple Bilingual Kindergarten Crosswittering Section) and 114 County Daomu Village section (Huanshan Road and 114 County Road intersection to Chetian River Bridge)

Second, traffic control method

Use half a closed half -to -traffic and single -sided opening of traffic;

not

Third, traffic control time

From July 20, 2022 to October 20, 2022, if there is an extension of the construction period, it will not be announced separately;

not

4. During the period of transportation control, the passengers and pedestrians are requested to drive in accordance with the provisions of this announcement and the road signs.

Special announcement

Jieyang Public Security Bureau Jiedong Branch Traffic Police Brigade

July 15, 2022

About the supporting project of the central urban area of ​​Rongcheng District and

Rongjiang Longshi Donghu State's Examination Facial Facial Tight Turbine

During the construction of water environmental governance project

A notice to implement traffic control in related road sections

not

Jieyang Rongcheng District Housing and Urban -Rural Development Bureau (owner) entrusts China Electricity Construction Group Kunming Survey and Design Research Institute Co., Ltd. (construction unit) to undertake the supporting project of the central urban area of ​​the Rongcheng District, the central urban area of ​​the Rongcheng District and the Rongjiang Longshi Donghu State The construction of the water environmental governance project will be under construction in the near future. In order to ensure the smooth progress of the project and the security and orderly road traffic safety, the traffic police detachment of the Jieyang Public Security Bureau in accordance with Article 39 of the Road Traffic Safety Law of the People's Republic of China Traffic control during the construction period of the road section, the relevant matters are announced as follows:

not

1. Scope of control

1. East area of ​​Ma Yan Avenue: Meiyang Road, Jianyang Road, Renyi Road, Huangqishan Avenue, Xinyang East Road, Xiaocui Road, Linjiang North Road, Xinhe Road, Rongjiang North Road, Lotus Avenue, Ring Ring, Ring Ring, Ring Road Northern Road, Binjiang North Road and roads in various communities.

2. West Terminal area of ​​Maga Avenue: Huanshi North Road, Martin Avenue, Binjiang North Road, Tampu Road, Linjiang North Road, Jianyang Road, Xinyang Road, Binjiang North Road, Meiyang Road and various communities roads Essence

3. Central areas: West Road, Xiguan Road, Wangjiang North Road, Ronghua Avenue, Tianfu Road, Tianfu East Road, Jinxianmen Avenue, Dongyi Street, Jinan Road, Tongxin Road, Dadonghu Road, Hong Kong Jinxianmen Dao Avenue, Yihe Road, Ronghu Road, Tongde Road, Meidou Road, Jieyang Avenue and the roads in various communities.

2. Control method

The construction of some motor lanes or non -motorized lanes is implemented in sections, and the remaining motor lanes and non -motorized lanes are normal.

3. Control time

From July 25, 2022, December 30, 2022.

Fourth, precautions

During the traffic control period, the passengers and pedestrians are requested to pass through in accordance with the provisions of this notice and the road signs to obey the traffic police and on -site safety personnel instructions.

announce

not

Jieyang Public Security Bureau Traffic Police Detachment

July 19, 2022

Source/ Jieyang Traffic Police

Edit/ Jiang Qijun

Responsible editor/Cai Le Shuang

Review/Chen Junping

- END -

Xiayi County Meteorological Bureau to remove high temperature orange warnings [Class II/severe]

Xiayi County Meteorological Observatory lifted the high -temperature orange warning signal released at 12:30 on June 8, 2022 on June 8, 2022.

Law enforcement "zero fines" to help to the front line -interpretation of Hebei "The Five Environmental Policy and Measures on Stabilizing the Economy"

Great Wall Network · Jiyun Client News (Reporter Zhang Jiaqi) Implementing the in...