They repair the water well for the community, and residents no longer worry about wet shoes
Author:Changjiang Daily Time:2022.07.21
The Yangtze River Daily Da Wuhan Client July 21 (Reporter Qin Liuwei Correspondent Chen Xia) "In the past few days, there is no stagnant water in the rain, and the road to entering and leaving the community is better." On the 21st, Qingshan Metallurgical Street Science and Technology Garden Cao Jie, resident of the community 30th street community, walked at the north gate of the community and said happily. Recently, with the help of the Water and Lakes Bureau of Qingshan District, the north gate of the 30th Street Community carried out the reconstruction of the sewage pipeline network, and the residents had no need to worry about stagnant water and mud.
It is understood that due to the construction of fast roads on metallurgical avenue, the pavement was raised for 40 ~ 50 cm. It rained in a few days, and the rain was poured into the 30th street community. There are no roads along the roadside of the community. The rainwater is mixed with the soil, and then the vehicles that come and go are brought into the community, causing the entire entrance and export road to mud, which not only affects the normal traffic of the residents, but also affects the environment of the community.
Cao Jie said: "This rain can not see the shoes in a community." Many residents reported to the community, hoping to solve the problem of rainwater pouring.
The interests of the masses are small. The Party Committee of the Science and Technology Garden Community attaches great importance to and includes the issue in the list of "lower grassroots, inspecting the people, relieving the people's worries, and warming the people's hearts". At the community talks, the secretary of the community party committee Deng Xifang introduced the situation to the Qingshan Water and Lakes Bureau, and the bureau decided to jointly solve the problem of water at the entrance of the community.
The party members of the Qingshan District Water and Lakes went to the scene for the first time. After the on -site examination, it was found that the road on the north gate of the 30th street community was low -lying and there were no rain wells. After finding the crux of the problem, the water and lake bureau of Qingshan District immediately finalized the solution: build a road along the road, and add 3 rain wells at the same time.
The next day after the conference, the construction team entered the construction. In less than a day, the rainwater well and the roadside stones were completed. Cao Jie said, "The efficiency of work is really high." Watching the inlet and export roads of the transformation, residents praised. Deng Xifang said: "Now, after the entrance and export of the community, the road is clean, there is no stagnant water, and the mood of residents has followed up. These party members do a real thing for residents."
【Edit: Ding】
- END -
This cosmetics, immediately remove the shelves
July 1stPublished by the State Drug Administration websiteAbout the name of stoppi...
Dongguan Youth Art Season · Hand -made Festival | Hand -made master Su Yan: Shouzheng Innovation Hand calls for the new life
Ceramics is the art of soil and fire, and it is also the art of life. Pottery work...